skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: 1000 hour test programme in a pressurised fluidised bed combustion facility. Volume II. Test data. Final report

Abstract

This is an appendix to a report on the operation and performance of pressurized fluidized bed combustors and their associated hot gas cleanup system with cyclone separators for use in a combined-cycle power plant. Each of 6 performance tests is described and the results for each test are given. For each test, data are presented on: combustor operating conditions; bed particle size distribution for both coal and dolomite feeds; heat and mass balances; sulfur retention; size and composition of particles in hot gas stream; and composition of solid wastes from combustor. (LCL)

Research Org.:
National Coal Board, Leatherhead (UK). Coal Utilization Research Lab.
OSTI Identifier:
6148390
Report Number(s):
DOE/ET/10423-1102
ON: DE81030969
DOE Contract Number:  
AC01-78ET10423
Resource Type:
Technical Report
Country of Publication:
United States
Language:
English
Subject:
20 FOSSIL-FUELED POWER PLANTS; COMBINED-CYCLE POWER PLANTS; FLUIDIZED-BED COMBUSTORS; HOT GAS CLEANUP; CYCLONE SEPARATORS; PERFORMANCE; AIR POLLUTION CONTROL; COAL; EXPERIMENTAL DATA; FLUIDIZED-BED COMBUSTION; FOSSIL-FUEL POWER PLANTS; PARTICLE SIZE; PARTICLES; CARBONACEOUS MATERIALS; CHEMICAL REACTIONS; COMBUSTION; COMBUSTORS; CONCENTRATORS; CONTROL; DATA; ENERGY SOURCES; EQUIPMENT; FOSSIL FUELS; FUELS; INERTIAL SEPARATORS; INFORMATION; MATERIALS; NUMERICAL DATA; OXIDATION; POLLUTION CONTROL; POLLUTION CONTROL EQUIPMENT; POWER PLANTS; PURIFICATION; SEPARATION EQUIPMENT; SIZE; THERMAL POWER PLANTS; THERMOCHEMICAL PROCESSES; 200104* - Fossil-Fueled Power Plants- Components; 200102 - Fossil-Fueled Power Plants- Power Cycles; 200202 - Fossil-Fueled Power Plants- Waste Management- Noxious Gas & Particulate Emissions

Citation Formats

. 1000 hour test programme in a pressurised fluidised bed combustion facility. Volume II. Test data. Final report. United States: N. p., Web.
. 1000 hour test programme in a pressurised fluidised bed combustion facility. Volume II. Test data. Final report. United States.
. . "1000 hour test programme in a pressurised fluidised bed combustion facility. Volume II. Test data. Final report". United States.
@article{osti_6148390,
title = {1000 hour test programme in a pressurised fluidised bed combustion facility. Volume II. Test data. Final report},
author = {},
abstractNote = {This is an appendix to a report on the operation and performance of pressurized fluidized bed combustors and their associated hot gas cleanup system with cyclone separators for use in a combined-cycle power plant. Each of 6 performance tests is described and the results for each test are given. For each test, data are presented on: combustor operating conditions; bed particle size distribution for both coal and dolomite feeds; heat and mass balances; sulfur retention; size and composition of particles in hot gas stream; and composition of solid wastes from combustor. (LCL)},
doi = {},
url = {https://www.osti.gov/biblio/6148390}, journal = {},
number = ,
volume = ,
place = {United States},
year = {},
month = {}
}

Technical Report:
Other availability
Please see Document Availability for additional information on obtaining the full-text document. Library patrons may search WorldCat to identify libraries that may hold this item. Keep in mind that many technical reports are not cataloged in WorldCat.

Save / Share: