CPC air-blown integrated gasification combined cycle project. Quarterly report, October--December 1992

License(s):

Other (Open)

The overall project cost and schedule. The combustion turbine commercial operation date is scheduled for 7/1/95 with the combined cycle commercial operation date of 7/1/96. A two year demonstration period will commence after IGCC commercial operation. Details of costs on a total project and DOE Envelope basis along with detailed schedule components were covered. Major cost variances to date were discussed. The major variances this year relate to contracts which were anticipated to be finalized mid 1992 but which are not executed. These include GEESI, the ASU and key vessels. Some of these contracts are almost in place and others are scheduled for the first quarter 1993. Numerous project specifications, process flow diagrams, piping and instrument diagrams and other drawings have been reviewed and approved as part of the preliminary engineering process.

Followers: 0

Citation (Click to Copy)

Data and Resources

    Gathering Resources...

Keywords

Additional Info

Field Value
Last Updated September 29, 2016, 16:44 (LMT)
Created September 29, 2016, 16:44 (LMT)
Citation Roy Long, CPC air-blown integrated gasification combined cycle project. Quarterly report, October--December 1992, 2016-09-29, https://edx.netl.doe.gov/dataset/cpc-air-blown-integrated-gasification-combined-cycle-project-quarterly-report-october-december-1
Netl Product yes
Poc Email Roy.long@netl.doe.gov
Point Of Contact Roy Long
Program Or Project KMD
Publication Date 1993-1-1