Spatial Search Clear

Map data © OpenStreetMap contributors
Tiles by MapBox


KeywordsClear Keywords

FormatsClear Formats

GroupsClear Groups

5319 submissions

Submissions within the EDX system encompass many different forms of data. This includes, but is not limited to, publications, files, apps, tools, or other resources that are data driven resources.

NETL
The scope of work at KRW Energy Systems, Inc. (KRW) under the current contract consists, in part, of designing and installing an external hot gas...
NETL
The design report for the KRW external hot gas cleanup system is in progress. The second air-blown gasifier PDU test for evaluation of in-bed...
NETL
This progress report discusses activities performed during the first two months under the new contract, DE-AC21-84MC21063, which covers a 32-month...
NETL
The external hot gas cleanup system at the PDU was commissioned in July 1986. From July 1986 to April 1987, three tests were completed to develop...
NETL
The external hot gas cleanup system at the PDU was commissioned in July 1986. From July 1986 to September 1987, six tests were completed to develop...
NETL
The scope of work under this contract consists, in part, of design and installation of an external hot gas cleanup system for testing in the...
NETL
Technology development at the Process Development Unit (PDU) in Waltz Mill, PA, has shown that the pressurized, ash-agglomerating fluidized-bed...
NETL
KRW Energy Systems Inc. completed installations of its external hot-gas-cleanup (HGCU) system at the Process Development Unit at Waltz Mill, PA....
NETL
This report presents process analysis of the Process Demonstration Unit (PDU) operations and is a continuation of the process analysis work...
NETL
This technology development program scope included studies of those processes and components necessary to convert coal, oxidant and steam into a...
NETL
KRW Energy Systems Inc. has been engaged in a coal gasification and hot gas cleanup technology development program at its pilot plant located at...
NETL
This document describes the general and specific requirements for the implementation of gasifier tests at the KRW pilot plant. In addition, this...
NETL
This report will serve as the final report on the work performed from the contract period October 2005 thru April 2007. The project 'A Built for...
NETL
The expected commercialization of coal gasification technology in the US and world-wide will create a need for advanced gas purification and...
NETL
This is the Technical Progress Report for the fourteenth quatier of activities under DOE Contract No. DE-AC22-94PC93054. It covers the period...
NETL
Under subcontract from CONSOL Inc., the University of Delaware studied the mechanism and kinetics of coal liquefaction resid conversion. The...
NETL
This is the Technical Progress Report for the eleventh quarter of activities under DOE Contract No. DE-AC22-94PC93054. It covers the period January...
NETL
Many operators of steamdrive projects will reduce the heat injection rate as the project matures. The major benefit of this practice is to reduce...
NETL
With the recent development of temperature measurement systems, continuous temperature profiles can be obtained with high precision. Small...
NETL
A method has been developed whereby the viscosity of a tar sand bitumen at any temperature can be calculated from nuclear magnetic resonance...