Filter by location Clear
"OpenStreetMap contributors"
Products
Type
Groups
Keywords
Formats
-
NETLLCA Unit Process: This process calculates emissions incurred from combustion of 1 MJ of ethanol blend E85 in an average U.S. passenger vehicle operating in 2005. OSTI ID: 1509314
-
Dataset Size: 243.52 KB
Resource List
View within SubmissionGathering Resources... -
-
NETLLCA Unit Process: Operation of a waterborne tanker for transport of LNG. Fueled primarily from boil-off with supplemental power from diesel fuel. Fuel requirements and select...
-
Dataset Size: 268.431 KB
Resource List
View within SubmissionGathering Resources... -
-
NETLLCA Unit Process: Based on the Illinois No. 6 underground, subbituminous coal mine unit process. Assumes all underground mining to be similar; 15.8 cubic feet/short ton coal...
-
Dataset Size: 517.226 KB
Resource List
View within SubmissionGathering Resources... -
-
NETLLCA Unit Process: Based on the Illinois No. 6 underground, bituminous coal mine unit process. Assumes all underground mining to be similar; 181 cubic feet/short ton coal mine...
-
Dataset Size: 517.121 KB
Resource List
View within SubmissionGathering Resources... -
-
NETLLCA Unit Process: The materials used for the construction of a trunkline that connects an electric power plant to the main electricity transmission grid. OSTI ID: 1509460
-
Dataset Size: 704.511 KB
Resource List
View within SubmissionGathering Resources... -
-
NETLLCA Unit Process: Calculates the number of locomotives and tanker railcars needed to carry fuel from a loading point to the plant/refinery over the lifetime of the plant....
-
Dataset Size: 267.327 KB
Resource List
View within SubmissionGathering Resources... -
-
NETLLCA Unit Process: Operation of a 250 MW solar thermal power plant. OSTI ID: 1509429
-
Dataset Size: 664.145 KB
Resource List
View within SubmissionGathering Resources... -
-
NETLLCA Unit Process: This process encompasses the materials required for the construction of a representative underground room and pillar uranium mine. Where uranium mine data were...
-
Dataset Size: 3.227 MB
Resource List
View within SubmissionGathering Resources... -
-
NETLLCA Unit Process: This process includes all inputs for the raw material transportation for 1 kg of cargo. OSTI ID: 1509332
-
Dataset Size: 770.739 KB
Resource List
View within SubmissionGathering Resources... -
-
NETLLCA Unit Process: Inputs and outputs for ethanol production by a thermochemical ethanol plant using cellulosic feedstocks. Includes addition of denaturant (gasoline) as 5...
-
Dataset Size: 468.339 KB
Resource List
View within SubmissionGathering Resources... -
-
NETLLCA Unit Process: Inputs and outputs for FTD production by a 5,000-barrel-per-day BTL plant using switchgrass feed. Includes scenarios for carbon capture and sequestration (CCS)...
-
Dataset Size: 352.282 KB
Resource List
View within SubmissionGathering Resources... -
-
NETLLCA Unit Process: This process includes all inputs for the raw material acquisition, raw material transportation, energy conversion, product transport, and end use for 1 MJ of...
-
Dataset Size: 830.202 KB
Resource List
View within SubmissionGathering Resources... -
-
NETLLCA Unit Process: This process includes all inputs for the raw material acquisition, raw material transportation, energy conversion, product transport, and end use for 1 MJ of...
-
Dataset Size: 831.613 KB
Resource List
View within SubmissionGathering Resources... -
-
NETLLCA Unit Process: This process includes all inputs for the raw material acquisition, raw material transportation, energy conversion, product transport, and end use for 1 MJ of...
-
Dataset Size: 765.467 KB
Resource List
View within SubmissionGathering Resources... -
-
NETLLCA Unit Process: Energy use for the dehydration of carbon dioxide extracted from a salt dome well. OSTI ID: 1509004
-
Dataset Size: 309.003 KB
Resource List
View within SubmissionGathering Resources... -
-
NETLLCA Unit Process: Based on specifications for a Joy Mining electric shearer. Assumes shearer constructed entirely of steel plate with negligible amounts of other materials....
-
Dataset Size: 248.628 KB
Resource List
View within SubmissionGathering Resources... -
-
NETLLCA Unit Process: Materials of construction and installation fuels and emissions for a natural gas well (Barnett Shale). OSTI ID: 1509101
-
Dataset Size: 696.933 KB
Resource List
View within SubmissionGathering Resources... -
-
NETLLCA Unit Process: Operation of an amine-based CO2 recovery system for post-membrane acid gas removal. OSTI ID: 1509442
-
Dataset Size: 534.492 KB
Resource List
View within SubmissionGathering Resources... -
-
NETLLCA Unit Process: This process includes all inputs for the raw material transportation for 1 kg of petroleum. OSTI ID: 1509317
-
Dataset Size: 879.688 KB
Resource List
View within SubmissionGathering Resources... -
-
NETLLCA Unit Process: Materials of construction and installation fuels and emissions for a petroleum well that produces crude oil and natural gas. OSTI ID: 1509113
-
Dataset Size: 697.245 KB
Resource List
View within SubmissionGathering Resources... -