Filter by location Clear
"OpenStreetMap contributors"
Type
Groups
Keywords
Formats
-
NETLAn improved pressure coring system is necessary for the accurate determination of the true fluid content of oil and gas reservoirs. This is particularly important in those...
-
Dataset Size: 413.327 KB
Resource List
View within SubmissionGathering Resources...NETLThis is the final report describing the evolution of the project ?Development and Optimization of Gas-Assisted Gravity Drainage (GAGD) Process for Improved Light Oil Recovery?...-
Dataset Size: 4.662 MB
Resource List
View within SubmissionGathering Resources...NETLMarch 1, 1981-May 31, 1981 is the second quarter of continuous superheated steam injection at the BX In Situ Oil Shale Project. During the quarter, 122,749 barrels of water as...-
Dataset Size: 12.265 MB
Resource List
View within SubmissionGathering Resources...NETLThis volume reports interim experimental and theoretical results of the first two years of a three year study of entrained coal gasification with steam and oxygen. The gasifier...-
Dataset Size: 0 bytes
Resource List
View within SubmissionGathering Resources...NETLMethane hydrate (ideally CH4?5.75H2O) has been found in ocean margin sediments, deep inland seas and permafrost regions around the world. As part of an ongoing effort to...-
Dataset Size: 61.561 KB
Resource List
View within SubmissionGathering Resources...NETLIn consideration of favorable information received via pyrolysis laboratory tests at UCC Research and from Coalite Chemicals in England, it is recommended that the pyrolysis...-
Dataset Size: 0 bytes
Resource List
View within SubmissionGathering Resources...NETLIn this quarter, activity focused on the placement of Flue Gas Desulfurization (FGD) grout into auger holes at the Sunny Ridge Mining Co. site. As discussed in previous reports,...-
Dataset Size: 0 bytes
Resource List
View within SubmissionGathering Resources...NETLThis Final Report summarizes Terralog's efforts and results for the project "Development of Improved Fracture Injection Disposal Techniques for Oilfield Waste", completed under...-
Dataset Size: 10.302 MB
Resource List
View within SubmissionGathering Resources...NETLThe design of test hardware and process development unit (PDU) modifications had been completed previously. Task VII involves the fabrication of test hardware and the...-
Dataset Size: 0 bytes
Resource List
View within SubmissionGathering Resources...NETLThe objective of this five-year project (October, 1997 - September, 2002) is to expand the current research activities of Tulsa University Separation Technology Projects (TUSTP)...-
Dataset Size: 368.108 KB
Resource List
View within SubmissionGathering Resources...NETLLimited demand and high cost has prevented the construction of hard rock caverns in this country for a number of years. The storage of natural gas in mined caverns may prove...-
Dataset Size: 4.324 MB
Resource List
View within SubmissionGathering Resources...NETLThe overall objective of the Westinghouse coal gasification program is to demonstrate the viability of the Westinghouse pressurized, fluidized bed, gasification system for the...-
Dataset Size: 0 bytes
Resource List
View within SubmissionGathering Resources...NETLCurrently work is being performed on Tasks 1.1, 1.2, 1.3, 1.4, 7.0 and 8.0. Well data and lease production history data are being collected, inventoried and scanned for web...-
Dataset Size: 269.666 KB
Resource List
View within SubmissionGathering Resources...NETLThis document presents a modeling and control study of the Fluid Bed Gasification (FBG) unit at the Morgantown Energy Technology Center (METC). The work is performed under...-
Dataset Size: 0 bytes
Resource List
View within SubmissionGathering Resources...NETLA 30 tons per day high rate, dry feed, entrained coal gasification process development unit was designed, constructed and operated to demonstrate the scale-up ability from an...-
Dataset Size: 0 bytes
Resource List
View within SubmissionGathering Resources...NETLThe majority of the planned remediation sites within the DOE complex are contaminated with volatile organic compounds (VOCs). In many instances the contamination has not reached...-
Dataset Size: 0 bytes
Resource List
View within SubmissionGathering Resources...NETLThe United States Department of Energy, Morgantown Energy Research Center (DOE/METC), is sponsoring the development of advanced, coal-fueled turbine power plants such as...-
Dataset Size: 0 bytes
Resource List
View within SubmissionGathering Resources...NETLThe industry cost shared program aims to benchmark drilling rates of penetration in selected simulated deep formations and to significantly improve ROP through a team...-
Dataset Size: 0 bytes
Resource List
View within SubmissionGathering Resources...NETLThis quarterly technical progress report summarizes the work completed during the first quarter, April 1 through June 30, 1995. The objective of this project is to evaluate hot...-
Dataset Size: 0 bytes
Resource List
View within SubmissionGathering Resources...NETLThis project was undertaken to demonstrate that oil and gas can be drilled and produced safely and economically from a fractured Monterey reservoir in the Santa Maria Basin of...-
Dataset Size: 0 bytes
Resource List
View within SubmissionGathering Resources... -