Filter by location Clear
"OpenStreetMap contributors"
Type
Groups
Keywords
Formats
-
NETLLCA Unit Process: This unit process calculates the construction materials that would be required for the installation of hydrokinetic turbines within a river. Hydrokinetic...
-
Dataset Size: 587.079 KB
Resource List
View within SubmissionGathering Resources...NETLLCA Unit Process: The amount of aluminum and steel used in the construction of one 244,000-lb capacity railcar to be used to haul coal. The railcar was estimated/assumed to be...-
Dataset Size: 241.674 KB
Resource List
View within SubmissionGathering Resources...NETLLCA Unit Process: Based on manufacturer specifications for a Caterpillar Model 160M, 213-horsepower (HP), 6-cylinder diesel motor grader. Assumes grader constructed entirely of...-
Dataset Size: 240.146 KB
Resource List
View within SubmissionGathering Resources...NETLLCA Unit Process: Based on manufacturer (Bucyrus) specifications for a 25M Series model, 755-horsepower (HP), underground continuous miner. Assumes continuous miner constructed...-
Dataset Size: 242.64 KB
Resource List
View within SubmissionGathering Resources...NETLLCA Unit Process: This unit process estimates input and output flows for assembling enriched UF6 into UO2 fuel assemblies for loading into nuclear reactors, including...-
Dataset Size: 342.693 KB
Resource List
View within SubmissionGathering Resources...NETLLCA Unit Process: Construction of a fuel transport pipeline, on the basis of pcs per kg of fuel transported over the plant lifetime. Includes steel pipe for pipeline; amount of...-
Dataset Size: 288.663 KB
Resource List
View within SubmissionGathering Resources...NETLLCA Unit Process: This unit process quantifies water and chemical inputs used in the production of fracturing fluid. OSTI ID: 1509379-
Dataset Size: 543.996 KB
Resource List
View within SubmissionGathering Resources...NETLLCA Unit Process: This unit process models the mass of steel plate and stainless steel used for the construction of ethanol storage tanks with a total capacity of 500,000...-
Dataset Size: 248.005 KB
Resource List
View within SubmissionGathering Resources...NETLLCA Unit Process: Combined construction/assembly process that includes material requirements for construction of a tractor and chip trailer for short rotation woody crop (SRWC)...-
Dataset Size: 265.991 KB
Resource List
View within SubmissionGathering Resources...NETLLCA Unit Process: Production of chromite, high-carbon ferrochromium, or chromium metal. OSTI ID: 1509341-
Dataset Size: 599.272 KB
Resource List
View within SubmissionGathering Resources...NETLLCA Unit Process: This unit process quantifies the materials required for the construction of a single grapple skidder, used for dragging cut trees from the harvester to the...-
Dataset Size: 253.073 KB
Resource List
View within SubmissionGathering Resources...NETLLCA Unit Process: This process encompasses the amount of materials required to construct a generation II PWR nuclear plant as well as the energy use required for installation...-
Dataset Size: 613.753 KB
Resource List
View within SubmissionGathering Resources...NETLLCA Unit Process: Based on specifications for a Joy Mining electric shearer. Assumes shearer constructed entirely of steel plate with negligible amounts of other materials....-
Dataset Size: 248.628 KB
Resource List
View within SubmissionGathering Resources...NETLLCA Unit Process: Based on manufacturer specifications for a Volvo Cab and a Polar Alm. trailer, 7,500 gallons, the cab and trailer are used in transporting petroleum based...-
Dataset Size: 282.218 KB
Resource List
View within SubmissionGathering Resources...NETLLCA Unit Process: Gasoline bulk storage tank based on Eagle Tanks Inc's 30,000 gal tank, adjusted to the needed capacity on a kg material/kg fuel basis. Includes security...-
Dataset Size: 310.307 KB
Resource List
View within SubmissionGathering Resources...NETLLCA Unit Process: Materials for the construction of an average U.S. gasoline passenger vehicle for the 2005 average fleet, allocated to 1 MJ of gasoline use. OSTI ID: 1509276-
Dataset Size: 275.394 KB
Resource List
View within SubmissionGathering Resources...NETLLCA Unit Process: This process encompasses the materials, drilling energy, and consequent emissions for the construction of a representative in situ mine used to extract...-
Dataset Size: 632.896 KB
Resource List
View within SubmissionGathering Resources...NETLLCA Unit Process: Based on specifications for a Powder River Coal Corp, 12,000-ton coal silo, used for railcar loading of PRB sub-bituminous coal at the mine site. Assumes silo...-
Dataset Size: 239.01 KB
Resource List
View within SubmissionGathering Resources...NETLLCA Unit Process: Input and output flows for producing 1 m3 precast concrete from a precast concrete plant. OSTI ID: 1509359-
Dataset Size: 1.082 MB
Resource List
View within SubmissionGathering Resources...NETLLCA Unit Process: This process estimates the electricity use to crush, grind, or mill a solid material. OSTI ID: 1509267-
Dataset Size: 332.309 KB
Resource List
View within SubmissionGathering Resources... -