Filter by location Clear
"OpenStreetMap contributors"
Type
Groups
Keywords
Formats
-
NETLLCA Unit Process: Based on manufacturer specifications for a Caterpillar Model 160M, 213-horsepower (HP), 6-cylinder diesel motor grader. Assumes grader constructed entirely of...
-
Dataset Size: 240.146 KB
Resource List
View within SubmissionGathering Resources... -
-
NETLLCA Unit Process: Quantifies the amount of materials needed to construct an individual CTL, CBTL, or BTL plant. Data based on construction of an IGCC plant. OSTI ID: 1509369
-
Dataset Size: 289.927 KB
Resource List
View within SubmissionGathering Resources... -
-
NETLLCA Unit Process: The materials used for the construction of a switchyard for a 200 MW wind farm. OSTI ID: 1509455
-
Dataset Size: 717.409 KB
Resource List
View within SubmissionGathering Resources... -
-
NETLLCA Unit Process: Construction of a Polymer Electrolyte Membrane electrolysis system for hydrogen production OSTI ID: 1922937
-
Dataset Size: 865.186 KB
Resource List
View within SubmissionGathering Resources... -
-
NETLLCA Unit Process: Materials of construction and installation fuels and emissions for a carbon dioxide well. OSTI ID: 1509005
-
Dataset Size: 707.938 KB
Resource List
View within SubmissionGathering Resources... -
-
NETLLCA Unit Process: Total amount of materials used in the construction of a crushing facility and the coal crusher. OSTI ID: 1509349
-
Dataset Size: 600.885 KB
Resource List
View within SubmissionGathering Resources... -
-
NETLLCA Unit Process: Assembly process that apportions the construction requirements of equipment used for the land preparation and cultivation of SRWC biomass. Equipment includes a...
-
Dataset Size: 236.78 KB
Resource List
View within SubmissionGathering Resources... -
-
NETLLCA Unit Process: Material inputs for retrofitting an existing pulverized coal (EXPC) power plant with carbon capture and sequestration (CCS). OSTI ID: 1509377
-
Dataset Size: 2.236 MB
Resource List
View within SubmissionGathering Resources... -
-
NETLLCA Unit Process: Based on specifications for an experimental tree harvester chipper designed specifically for collecting trees for biomass. Assumes that the machine is...
-
Dataset Size: 241.258 KB
Resource List
View within SubmissionGathering Resources... -
-
NETLLCA Unit Process: Based on manufacturer specifications for a Bucyrus 8750, 8,200 short ton dragline used in mining for a surface mine. This unit process quantifies the amount of...
-
Dataset Size: 244.689 KB
Resource List
View within SubmissionGathering Resources... -
-
NETLLCA Unit Process: This unit process quantifies the construction requirements for either a concrete or an earthen dam, used for large scale conventional hydropower. OSTI ID:...
-
Dataset Size: 872.031 KB
Resource List
View within SubmissionGathering Resources... -
-
NETLLCA Unit Process: Based on manufacturer specifications for a Gundlach Braker model 12048, 254,000 lbs, used in crushing coal, this unit process quantifies the amount of steel...
-
Dataset Size: 238.795 KB
Resource List
View within SubmissionGathering Resources... -
-
NETLLCA Unit Process: Construction process that includes material requirements for the construction of a coal cleaning facility, which is a steel building used to house coal...
-
Dataset Size: 749.114 KB
Resource List
View within SubmissionGathering Resources... -
-
NETLLCA Unit Process: Materials of construction and installation fuels and emissions for a well for underground storage of CO2. OSTI ID: 1509346
-
Dataset Size: 761.535 KB
Resource List
View within SubmissionGathering Resources... -
-
NETLLCA Unit Process: Combined construction/assembly process that includes material requirements for construction of a tractor and chip trailer for short rotation woody crop (SRWC)...
-
Dataset Size: 265.991 KB
Resource List
View within SubmissionGathering Resources... -
-
NETLLCA Unit Process: This unit process models the mass of steel plate and stainless steel used for the construction of ethanol storage tanks with a total capacity of 500,000...
-
Dataset Size: 248.005 KB
Resource List
View within SubmissionGathering Resources... -
-
NETLLCA Unit Process: The amount of aluminum used in the construction of one 26,470 gallon net capacity tanker railcar to be used to haul liquid fuel. The railcar was assumed to be...
-
Dataset Size: 321.82 KB
Resource List
View within SubmissionGathering Resources... -
-
NETLLCA Unit Process: This unit process provides the material inputs for the construction of a steel storage container for UF6 storage and transportation. Through the parameters,...
-
Dataset Size: 560.186 KB
Resource List
View within SubmissionGathering Resources... -
-
NETLLCA Unit Process: Based on advertised specifications for an Xstrata Rolleston coal stacker. Assumes stockpile stacker constructed entirely of steel plate, with negligible...
-
Dataset Size: 286.955 KB
Resource List
View within SubmissionGathering Resources... -
-
NETLLCA Unit Process: The materials used for the construction of a trunkline that connects an electric power plant to the main electricity transmission grid. OSTI ID: 1509460
-
Dataset Size: 704.511 KB
Resource List
View within SubmissionGathering Resources... -