Filter by location Clear
"OpenStreetMap contributors"
  Products
Type
Groups
Keywords
Formats
There are no Formats that match this search
- 
    
      NETL"This report presents the results of an aerial photographic analysis of an in situ tar sands recovery site carried out by the U.S. Environmental Protection Agency in...- 
                  Dataset Size: 3.266 MB
 Resource ListView within SubmissionGathering Resources...
- 
                  
- 
    
      NETLUnder a cost sharing agreement with the U.S. Department of Energy, the Paraho Development Corporation is developing conceptual designs for the first full-scale module to retort...- 
                  Dataset Size: 22.668 MB
 Resource ListView within SubmissionGathering Resources...
- 
                  
- 
    
      NETLThe rare occurrences of condensive carbon dioxide accumulations is probably the principal reason the North McCallam field has received the attention and publicity not normally...- 
                  Dataset Size: 543.45 KB
 Resource ListView within SubmissionGathering Resources...
- 
                  
- 
    
      NETLThe predevelopment program for Naval Oil Shale Reserve Number 1 (NOSR 1), located in Colorado, was initiated in 1945 when the Bureau of Mines began assessment of the shale...- 
                  Dataset Size: 13.063 MB
 Resource ListView within SubmissionGathering Resources...
- 
                  
- 
    
      NETL"Under the authorization of the Synthetic Liquid Fuels Act of April 1944 (Public Law 290), the Bureau of Mines has operated coal-to-oil facilities at Bruceton, Pa., Morgantown,...- 
                  Dataset Size: 2.226 MB
 Resource ListView within SubmissionGathering Resources...
- 
                  
- 
    
      NETL"Since the founding legislation in 1944, the Laramie Energy Technology Center (LETC) and the associated Anvil Points Oil Shale Facility have been affiliated with three...- 
                  Dataset Size: 1.418 MB
 Resource ListView within SubmissionGathering Resources...
- 
                  
- 
    
      NETLThe work performed during the sixth quarterly reporting period (February 21, 1992 through May 20, 1993) on the research program, Scale-Up of Mild Gasification to a Process...- 
                  Dataset Size: 0 bytes
 Resource ListView within SubmissionGathering Resources...
- 
                  
- 
    
      NETLThe United States Department of Energy (DOE) established a Waste Management Program within the Office of Fossil Energy. A key goal of this program is to ensure that waste...- 
                  Dataset Size: 0 bytes
 Resource ListView within SubmissionGathering Resources...
- 
                  
- 
    
      NETLThis developmental effort clearly shows that a Road Transportable Analytical Laboratory System is a worthwhile and achievable goal. The RTAL is designed to fully analyze...- 
                  Dataset Size: 0 bytes
 Resource ListView within SubmissionGathering Resources...
- 
                  
- 
    
      NETLAll of the current coal conversion and utilization processes require valves for throttling fluids containing solid particles and other harsh contaminants derived from coal at...- 
                  Dataset Size: 0 bytes
 Resource ListView within SubmissionGathering Resources...
- 
                  
- 
    
      NETLIn the Geokinetics process, a pattern of blast holes is drilled from the surface, through the overburden, and into the oil shale bed. The holes are loaded with explosives and...- 
                  Dataset Size: 0 bytes
 Resource ListView within SubmissionGathering Resources...
- 
                  
- 
    
      NETLTo aid in the development of a prototype fluidized-bed boiler burning anthracite culm, the combustion characteristics of culm were examined in a 12-inch FluoSolids Reactor at...- 
                  Dataset Size: 0 bytes
 Resource ListView within SubmissionGathering Resources...
- 
                  
- 
    
      NETLThe work performed during the seventh quarterly reporting period on the research program, Scale-up of Mild Gasification to a Process Development Unit is presented in this...- 
                  Dataset Size: 0 bytes
 Resource ListView within SubmissionGathering Resources...
- 
                  
- 
    
      NETLThis document, Volume 5 Book 8, contains cost estimate information for a Monitored Retrievable Storage (MRS) facility. Cost estimates are for the Clinch River Site, alternate...- 
                  Dataset Size: 194.677 MB
 Resource ListView within SubmissionGathering Resources...
- 
                  
- 
    
      NETLThis document, Volume 4 Book 7, contains mechanical process calculation information for a Monitored Retrievable storage (MRS) facility. (KJD)- 
                  Dataset Size: 57.668 MB
 Resource ListView within SubmissionGathering Resources...
- 
                  
- 
    
      NETLThis report details the activities, facilities, and equipment used to sample raw feedstock and waste solids at the Iowa-Illinois Gas and Electric Company's Riverside Plant....- 
                  Dataset Size: 8.567 MB
 Resource ListView within SubmissionGathering Resources...
- 
                  
- 
    
      NETLThis report has been prepared by Solar Turbines Incorporated (Solar) in accordance with Task 2 of the Advanced Turbine Systems (ATS) Contract. This report addresses only the...- 
                  Dataset Size: 0 bytes
 Resource ListView within SubmissionGathering Resources...
- 
                  
- 
    
      NETLAt the Grimethorpe Experimental Facility the valves which control the combustor freeboard pressure are known as the back end valves. They are situated downstream of the main...- 
                  Dataset Size: 0 bytes
 Resource ListView within SubmissionGathering Resources...
- 
                  
- 
    
      NETLIn October, a contract was awarded for the Installation of a Devonian Shale Reservoir Testing Facility and Acquisition of Reservoir Property measurements from wells in the...- 
                  Dataset Size: 0 bytes
 Resource ListView within SubmissionGathering Resources...
- 
                  
- 
    
      NETLThis document, Volume 5 Book 7, contains cost estimate information for a monitored retrievable storage (MRS) facility. Cost estimates are for onsite improvements, waste storage,...- 
                  Dataset Size: 511.3 MB
 Resource ListView within SubmissionGathering Resources...
- 
                  
 
            