Filter by location Clear
"OpenStreetMap contributors"
Products
Type
Groups
Keywords
Formats
-
NETLLCA Unit Process: This process includes all inputs for the raw material acquisition 1 kg of natural gas via average associated extraction. OSTI ID: 1509289
-
Dataset Size: 971.193 KB
Resource List
View within SubmissionGathering Resources... -
-
NETLLCA Unit Process: Emissions to air and water from petroleum refining (includes flaring but not combustion GHGs). OSTI ID: 1509439
-
Dataset Size: 1.296 MB
Resource List
View within SubmissionGathering Resources... -
-
NETLLCA Unit Process: Materials of construction and installation fuels and emissions for a natural gas well (coal bed methane). OSTI ID: 1509102
-
Dataset Size: 693.419 KB
Resource List
View within SubmissionGathering Resources... -
-
NETLLCA Unit Process: Separation of CO2 and hydrocarbons using membrane technology. OSTI ID: 1509404
-
Dataset Size: 434.262 KB
Resource List
View within SubmissionGathering Resources... -
-
NETLLCA Unit Process: This process encompasses the installation/deinstallation of a LNG liquefaction facility. OSTI ID: 1509283
-
Dataset Size: 314.638 KB
Resource List
View within SubmissionGathering Resources... -
-
NETLLCA Unit Process: Fugitive emissions of natural gas from natural gas distribution. OSTI ID: 1559818
-
Dataset Size: 339.101 KB
Resource List
View within SubmissionGathering Resources... -
-
Geospatial NETLThe project Characterization of the Triassic Newark Basin of New York and New Jersey for Geologic Storage of Carbon Dioxide is one of 9 site characterization projects that were...
-
Dataset Size: 29.328 GB
Resource List
View within SubmissionGathering Resources... -
-
NETLLCA Unit Process: Transport of liquid diesel fuel via a pipeline powered by electric pumps. No loss of fuel is assumed during pipeline transport. OSTI ID: 1509184
-
Dataset Size: 230.297 KB
Resource List
View within SubmissionGathering Resources... -
-
NETLLCA Unit Process: Transport of an unspecified form of petroleum-based fuel via train to the energy conversion facility. Assumes back haul and front haul have the same energy...
-
Dataset Size: 284.836 KB
Resource List
View within SubmissionGathering Resources... -
-
NETLLCA Unit Process: This process includes all inputs for the raw material acquisition 1 kg of natural gas via average LNG extraction. OSTI ID: 1509294
-
Dataset Size: 996.214 KB
Resource List
View within SubmissionGathering Resources... -
-
NETLLCA Unit Process: Materials of construction and installation fuels and emissions for a natural gas well (conventional offshore). OSTI ID: 1509103
-
Dataset Size: 702.607 KB
Resource List
View within SubmissionGathering Resources... -
-
NETLLCA Unit Process: The amount of steel used in the construction of one 120 short ton payload electric shovel, used to haul overburden and extract coal at a large surface mine....
-
Dataset Size: 223.812 KB
Resource List
View within SubmissionGathering Resources... -
-
NETLLCA Unit Process: This unit process includes operations for land preparation for corn stover including diesel use, dust emissions, and a calculation of required land area....
-
Dataset Size: 318.286 KB
Resource List
View within SubmissionGathering Resources... -
-
NETLLCA Unit Process: Construction of a collector field for a 250 MW solar thermal power plant. OSTI ID: 1509360
-
Dataset Size: 642.696 KB
Resource List
View within SubmissionGathering Resources... -
-
Geospatial NETLThe project Site Characterization of the Highest-Priority Geologic Formations for CO2 Storage in Wyoming is one of 9 site characterization projects that were implemented as part...
-
Dataset Size: 21.039 KB
Resource List
View within SubmissionGathering Resources... -
-
NETLLCA Unit Process: This process includes all inputs for the raw material acquisition and raw material transportation for 1 kg of delivered uranium fuel assemblies assuming...
-
Dataset Size: 1.342 MB
Resource List
View within SubmissionGathering Resources... -
-
NETLLCA Unit Process: This process constructs an LNG tanker water carrier with 125,000 m3 load capacity (before heel). The material requirements and weights are determined for...
-
Dataset Size: 243.812 KB
Resource List
View within SubmissionGathering Resources... -
-
NETLLCA Unit Process: This unit process models the material inputs required for the construction of a generic Uranium Hexafluoride Conversion Facility. Materials considered are...
-
Dataset Size: 2.948 MB
Resource List
View within SubmissionGathering Resources... -
-
NETLLCA Unit Process: This process includes all inputs for the raw material acquisition, raw material transportation, energy conversion, product transport, and end use for 1 MJ of...
-
Dataset Size: 802.68 KB
Resource List
View within SubmissionGathering Resources... -
-
NETLLCA Unit Process: Based on manufacturer (Bucyrus) specifications for a 25M Series model, 755-horsepower (HP), underground continuous miner. Assumes continuous miner constructed...
-
Dataset Size: 242.64 KB
Resource List
View within SubmissionGathering Resources... -