NETLLCA Unit Process: Based on specifications for a Joy Mining line pan. Assumes line pan constructed entirely of steel plate, with negligible amounts of other materials. OSTI ID:...
-
Dataset Size: 247.449 KB
Resource List
View within SubmissionGathering Resources...NETLLCA Unit Process: This process encompasses the construction of a LNG liquefaction facility. OSTI ID: 1509282-
Dataset Size: 307.29 KB
Resource List
View within SubmissionGathering Resources...NETLLCA Unit Process: This unit process quantifies the construction requirements for either a concrete or an earthen dam, used for large scale conventional hydropower. OSTI ID:...-
Dataset Size: 872.031 KB
Resource List
View within SubmissionGathering Resources...NETLLCA Unit Process: Materials of construction and installation fuels and emissions for a carbon dioxide well. OSTI ID: 1509005-
Dataset Size: 707.938 KB
Resource List
View within SubmissionGathering Resources...NETLLCA Unit Process: Based on manufacturer specifications for a Bucyrus 8750, 8,200 short ton dragline used in mining for a surface mine. This unit process quantifies the amount of...-
Dataset Size: 244.689 KB
Resource List
View within SubmissionGathering Resources...NETLLCA Unit Process: Materials for the construction of an average U.S. diesel passenger vehicle for the 2005 average fleet, allocated to 1 MJ of diesel use. OSTI ID: 1509270-
Dataset Size: 441.312 KB
Resource List
View within SubmissionGathering Resources...NETLLCA Unit Process: Quantifies the amount of materials needed to construct an individual CTL, CBTL, or BTL plant. Data based on construction of an IGCC plant. OSTI ID: 1509369-
Dataset Size: 289.927 KB
Resource List
View within SubmissionGathering Resources...NETLLCA Unit Process: Based on specifications for a 2-meter-wide hydraulic shield. Assumes shield constructed entirely of steel plate with negligible amounts of other materials....-
Dataset Size: 247.48 KB
Resource List
View within SubmissionGathering Resources...NETLLCA Unit Process: This unit process quantifies the construction materials required for the construction of an approximately 46 short ton empty weight Boeing 737-800 jet...-
Dataset Size: 402.059 KB
Resource List
View within SubmissionGathering Resources...NETLLCA Unit Process: Material input for the construction of the NETL baseline integrated gasification combined cycle (IGCC) plant with or without carbon capture and sequestration...-
Dataset Size: 356.449 KB
Resource List
View within SubmissionGathering Resources...NETLLCA Unit Process: Indirect GHG emissions from land transformation in U.S. OSTI ID: 1509279-
Dataset Size: 434.732 KB
Resource List
View within SubmissionGathering Resources...NETLLCA Unit Process: Based on manufacturer specifications for a John Deere model 348, 3110 lbs, tractor-propelled square baler used in harvesting switchgrass and corn stover....-
Dataset Size: 242.105 KB
Resource List
View within SubmissionGathering Resources...NETLLCA Unit Process: Calculates the amount of materials (including concrete, steel plate, and stainless steel) needed to construct an individual Advanced Dry Mill plant with CCS....-
Dataset Size: 234.336 KB
Resource List
View within SubmissionGathering Resources...NETLLCA Unit Process: Combined construction/assembly process that includes material requirements for construction of a bale truck (tractor-trailer combination) for switchgrass or...-
Dataset Size: 261.113 KB
Resource List
View within SubmissionGathering Resources...NETLLCA Unit Process: Calculates the amount of materials (including concrete, steel plate, and stainless steel) needed to construct an individual Advanced Dry Mill plant. Data based...-
Dataset Size: 225.848 KB
Resource List
View within SubmissionGathering Resources...NETLLCA Unit Process: Material inputs for retrofitting an existing pulverized coal (EXPC) power plant with carbon capture and sequestration (CCS). OSTI ID: 1509377-
Dataset Size: 2.236 MB
Resource List
View within SubmissionGathering Resources...NETLLCA Unit Process: This unit process quantifies the materials required for the construction of a single disc wood micro-chipper, used for the chipping of woody biomass into small...-
Dataset Size: 253.123 KB
Resource List
View within SubmissionGathering Resources...NETLLCA Unit Process: Encompasses the materials necessary to construct a single blasthole drill to drill holes for blasting at a large surface coal mine with dragline based on a...-
Dataset Size: 242.581 KB
Resource List
View within SubmissionGathering Resources...NETLLCA Unit Process: Materials of construction and installation fuels and emissions for a well for underground storage of CO2. OSTI ID: 1509346-
Dataset Size: 761.535 KB
Resource List
View within SubmissionGathering Resources...NETLLCA Unit Process: Material input for the construction of the NETL baseline supercritical pulverized coal (SCPC) plant with or without carbon capture and sequestration (CCS)....-
Dataset Size: 372.809 KB
Resource List
View within SubmissionGathering Resources... -