Filter by location Clear
"OpenStreetMap contributors"
Type
Groups
Keywords
Formats
-
NETLProgress is reported for the period from April 1, 2003 to June 30, 2003. The pilot water injection plant became operational 4/18/03 and began long-term injection in the CO2I...
-
Dataset Size: 0 bytes
Resource List
View within SubmissionGathering Resources...NETLIn the second quarter of this DOE NETL project, we have continued Phase I and Phase II activities for researching and developing new technology to quantitatively model the rock...-
Dataset Size: 0 bytes
Resource List
View within SubmissionGathering Resources...NETLDuring Phase I (first 18 months) the project is segregated into four areas of reporting: (A) Grout Formulation, (B) Grout Characterization, (C) Water Quality Monitoring, (D)...-
Dataset Size: 0 bytes
Resource List
View within SubmissionGathering Resources...NETLMarine gas hydrates incorporate significant concentrations of natural gases in their cages, mostly methane, and also ethane, propane, CO2 and H2S. Some anthropogenic tracers...-
Dataset Size: 322.021 KB
Resource List
View within SubmissionGathering Resources...NETLThe objective of this project is to design and develop a physico-chemical treatment process for the removal of uranium and heavy metals from contaminated soil to achieve target...-
Dataset Size: 0 bytes
Resource List
View within SubmissionGathering Resources...NETLThe Allison Gas Turbine Division (Allison) of General Motors Corporation conducted the Advanced Turbine Systems (ATS) program feasibility study (Phase I) in accordance with the...-
Dataset Size: 0 bytes
Resource List
View within SubmissionGathering Resources...NETLThe deep hard rock drilling environment induces severe vibrations into the drillstring, which can cause reduced rates of penetration (ROP) and premature failure of the...-
Dataset Size: 0 bytes
Resource List
View within SubmissionGathering Resources...NETLA significant work program has been implemented in the East Binger Unit (''EBU'') miscible nitrogen injection project in an effort to reduce gas cycling and economically...-
Dataset Size: 0 bytes
Resource List
View within SubmissionGathering Resources...NETLThe Big Sky Carbon Sequestration Partnership, led by Montana State University, is comprised of research institutions, public entities and private sectors organizations, and the...-
Dataset Size: 0 bytes
Resource List
View within SubmissionGathering Resources...NETLThis annual report describes the Blast Furnace Granular Coal Injection project being implemented at Bethlehem Steel Corporation`s (BSC) Burns Harbor Plant. The project is...-
Dataset Size: 0 bytes
Resource List
View within SubmissionGathering Resources...NETLPhase I results of a CO2-assisted or recovery demonstration project in selected Cypress Sandstone reservoirs at Mattoon Reid, Illinois are reported. The design and scope of this...-
Dataset Size: 3.61 MB
Resource List
View within SubmissionGathering Resources...NETLThis report describes the progress of the project ''Development And Optimization of Gas-Assisted Gravity Drainage (GAGD) Process for Improved Light Oil Recovery''for the...-
Dataset Size: 0 bytes
Resource List
View within SubmissionGathering Resources...NETLA significant work program was implemented from 2002 to 2005 in the East Binger Unit (''EBU'') miscible nitrogen injection project in an effort to reduce gas cycling and...-
Dataset Size: 0 bytes
Resource List
View within SubmissionGathering Resources...NETLA significant work program was implemented from 2002 to 2004 in the East Binger Unit (''EBU'') miscible nitrogen injection project in an effort to reduce gas cycling and...-
Dataset Size: 0 bytes
Resource List
View within SubmissionGathering Resources...NETLAlthough a large quantity of core permeability data was provided for the coastal interval, some additional measurements were made(Table I), primarily for the purpose of...-
Dataset Size: 511.849 KB
Resource List
View within SubmissionGathering Resources...NETLThis topical report covers the first 12 months of the subject 3-year grant, evaluating the relationship between fracture-related dolomite and dolomite constrained by primary...-
Dataset Size: 0 bytes
Resource List
View within SubmissionGathering Resources...NETLA significant work program was implemented from 2002 to 2005 in the East Binger Unit (''EBU'') miscible nitrogen injection project in an effort to reduce gas cycling and...-
Dataset Size: 0 bytes
Resource List
View within SubmissionGathering Resources...NETL"he study was prepared cooperatively as part of the AECs Plowshare Program by the San Francisco Operations Office of the U. S. Atomic Energy Commission, the U. S. Bureau of...-
Dataset Size: 10.461 MB
Resource List
View within SubmissionGathering Resources...NETLThe two phase program addresses long-term developments in deep well and hard rock drilling. TerraTek believes that significant improvements in drilling deep hard rock will be...-
Dataset Size: 0 bytes
Resource List
View within SubmissionGathering Resources...NETLFor strategic, economic, and environmental reasons, many U.S. drilling frontiers deserve further review. One such frontier is natural gas in deep sedimentary basins. Deep...-
Dataset Size: 185.729 KB
Resource List
View within SubmissionGathering Resources... -