Filter by location Clear
"OpenStreetMap contributors"
Type
Groups
Keywords
Formats
-
NETLLCA Unit Process: Steel-Cord Conveyor System, 72", Construction. OSTI ID: 1509135
-
Dataset Size: 335.841 KB
Resource List
View within SubmissionGathering Resources...NETLLCA Unit Process: The amount of steel needed for the construction of one 239 HP loader to be used to haul coal at a large surface mine. The railcar was assumed to be composed of...-
Dataset Size: 219.943 KB
Resource List
View within SubmissionGathering Resources...NETLLCA Unit Process: Based on manufacturer specifications for a John Deere Model 425 disk harrow tractor-propelled, 5,015-lb tiller. This unit process quantifies the amount of...-
Dataset Size: 240.871 KB
Resource List
View within SubmissionGathering Resources...NETLLCA Unit Process: Construction of a Polymer Electrolyte Membrane electrolysis system for hydrogen production OSTI ID: 1922937-
Dataset Size: 865.186 KB
Resource List
View within SubmissionGathering Resources...NETLLCA Unit Process: Calculates the quantity of each piece of equipment needed to extract and produce coal at a large surface mine, mining PRB sub-bituminous coal, over the...-
Dataset Size: 315.464 KB
Resource List
View within SubmissionGathering Resources...NETLLCA Unit Process: This process encompasses the materials required for the construction of a representative underground room and pillar uranium mine. Where uranium mine data were...-
Dataset Size: 3.227 MB
Resource List
View within SubmissionGathering Resources...NETLLCA Unit Process: The metal materials and mineral oil used for the construction of a padmount transformer with a rating from 1000 to 7500 kVA. OSTI ID: 1509458-
Dataset Size: 597.824 KB
Resource List
View within SubmissionGathering Resources...NETLLCA Unit Process: This process builds a cask to store the nuclear spent fuel. It is designed to both store the spent fuel with the option of re-arranging the spent fuel within...-
Dataset Size: 570.66 KB
Resource List
View within SubmissionGathering Resources...NETLLCA Unit Process: This unit process quantifies the materials, fuels, and emissions that are needed for/would result from construction and installation of a generic natural gas...-
Dataset Size: 701.315 KB
Resource List
View within SubmissionGathering Resources...NETLLCA Unit Process: Materials of construction and installation fuels and emissions for a natural gas well (conventional offshore). OSTI ID: 1509103-
Dataset Size: 702.607 KB
Resource List
View within SubmissionGathering Resources...NETLLCA Unit Process: Materials of construction and installation fuels and emissions for a natural gas well (coal bed methane). OSTI ID: 1509102-
Dataset Size: 693.419 KB
Resource List
View within SubmissionGathering Resources...NETLLCA Unit Process: Based on specifications for an experimental tree harvester chipper designed specifically for collecting trees for biomass. Assumes that the machine is...-
Dataset Size: 241.258 KB
Resource List
View within SubmissionGathering Resources...NETLLCA Unit Process: Assembly process that apportions the construction requirements of equipment used for the cultivation of switchgrass biomass. Equipment includes tractors,...-
Dataset Size: 229.358 KB
Resource List
View within SubmissionGathering Resources...NETLLCA Unit Process: Based on manufacturer specifications for a John Deere Model 1990 central commodity system (CCS) air drill and a John Deere Model 1870 air hoe drill, which make...-
Dataset Size: 242.361 KB
Resource List
View within SubmissionGathering Resources...NETLLCA Unit Process: Assembly process that apportions the construction requirements of equipment used for Switchgrass harvesting. Equipment includes forage harvesters and balers....-
Dataset Size: 223.394 KB
Resource List
View within SubmissionGathering Resources...NETLLCA Unit Process: Material input for the construction of the NETL baseline NGCC plant with or without CCS. OSTI ID: 1509418-
Dataset Size: 381.099 KB
Resource List
View within SubmissionGathering Resources...NETLLCA Unit Process: Assembly process that apportions the construction requirements of equipment used for land preparation for switchgrass. Equipment includes bulldozers and motor...-
Dataset Size: 224.502 KB
Resource List
View within SubmissionGathering Resources...NETLLCA Unit Process: The materials used for the construction of a switchyard for a 200 MW wind farm. OSTI ID: 1509455-
Dataset Size: 717.409 KB
Resource List
View within SubmissionGathering Resources...NETLLCA Unit Process: This process constructs an LNG tanker water carrier with 125,000 m3 load capacity (before heel). The material requirements and weights are determined for...-
Dataset Size: 243.812 KB
Resource List
View within SubmissionGathering Resources...NETLLCA Unit Process: Hydraulic fracturing (fracking) of a horizontal well. OSTI ID: 1509468-
Dataset Size: 1.093 MB
Resource List
View within SubmissionGathering Resources... -