Filter by location Clear
"OpenStreetMap contributors"
Type
Groups
Keywords
Formats
-
NETLLCA Unit Process: This unit process tracks the materials and energy needed to manufacture a nacelle cover for a horizontal axis wind turbine, having capacities ranging from 1.5...
-
Dataset Size: 843.64 KB
Resource List
View within SubmissionGathering Resources...NETLLCA Unit Process: This unit process provides a summary of the energy and materials required for the manufacture of a horizontal wind turbine tower, ranging in capacity from 1.5...-
Dataset Size: 624.531 KB
Resource List
View within SubmissionGathering Resources...NETLLCA Unit Process: This unit process quantifies the materials needed for the manufacture of 1 meter of 35 kV capacity cable, for use with horizontal wind turbines ranging in...-
Dataset Size: 741.055 KB
Resource List
View within SubmissionGathering Resources...NETLLCA Unit Process: Manufacture of shafts and bearings for a horizontal multi-capacity (1.5-6 MW) wind turbine. Assumes shafts (main & low-speed) and bearings are manufactured...-
Dataset Size: 679.8 KB
Resource List
View within SubmissionGathering Resources...NETLLCA Unit Process: Manufacture of a spinner (nose cone) for 1.5-6 MW capacity horizontal wind turbine, manufactured of resin and glass reinforced plastic (GRP) materials with...-
Dataset Size: 625.118 KB
Resource List
View within SubmissionGathering Resources...NETLLCA Unit Process: Manufacture of a horizontal wind turbine main frame, based on NREL specifications for a multi capacity (range 1.5 - 6 MW) wind turbine main frame (bed). OSTI...-
Dataset Size: 625.378 KB
Resource List
View within SubmissionGathering Resources...NETLLCA Unit Process: Diesel bulk storage tank based on Eagle Tanks Inc's 30,000 gal tank, adjusted to the needed capacity on a kg material/kg fuel basis. Includes security storage...-
Dataset Size: 311.021 KB
Resource List
View within SubmissionGathering Resources...NETLLCA Unit Process: Calculates the number of locomotives and railcars needed to haul coal from the coal mine to the power plant over the lifetime of the plant. Assumes one...-
Dataset Size: 271.308 KB
Resource List
View within SubmissionGathering Resources...NETLLCA Unit Process: Models manufacturing of the hub, blade pitch mechanisms, and bearings of a variable megawatt (range 1.5 -6MW) capacity wind turbine. Assumes all components...-
Dataset Size: 627.979 KB
Resource List
View within SubmissionGathering Resources...NETLLCA Unit Process: Manufacture of turbine blades, based on NREL specifications for a horizontal axis multi capacity (1.5-6 MW) wind turbine. Assumes blades manufactured of CRP...-
Dataset Size: 648.906 KB
Resource List
View within SubmissionGathering Resources...NETLLCA Unit Process: Harvester based on manufacturer specifications for a John Deere Model 9770 STS Combine, 300-bushel capacity, and a John Deere Model 612c Stalkmaster corn...-
Dataset Size: 243.556 KB
Resource List
View within SubmissionGathering Resources...NETLLCA Unit Process: The amount of aluminum and steel used in the construction of one 244,000-lb capacity railcar to be used to haul coal. The railcar was estimated/assumed to be...-
Dataset Size: 241.674 KB
Resource List
View within SubmissionGathering Resources...NETLLCA Unit Process: This unit process includes operation of a liquefied natural gas (LNG) ocean tanker, having a capacity of 138,000 cubic meters. The tanker is fueled by boil-off...-
Dataset Size: 608.401 KB
Resource List
View within SubmissionGathering Resources...NETLLCA Unit Process: This unit process models the mass of steel plate and stainless steel used for the construction of ethanol storage tanks with a total capacity of 500,000...-
Dataset Size: 248.005 KB
Resource List
View within SubmissionGathering Resources...NETLLCA Unit Process: Gasoline bulk storage tank based on Eagle Tanks Inc's 30,000 gal tank, adjusted to the needed capacity on a kg material/kg fuel basis. Includes security...-
Dataset Size: 310.307 KB
Resource List
View within SubmissionGathering Resources...NETLLCA Unit Process: Steel requirements for the construction of an ocean vessel with a cargo capacity of 30,000 DWT. OSTI ID: 1509423-
Dataset Size: 2.019 MB
Resource List
View within SubmissionGathering Resources...NETLLCA Unit Process: Calculates the number of locomotives and tanker railcars needed to carry fuel from a loading point to the plant/refinery over the lifetime of the plant....-
Dataset Size: 267.327 KB
Resource List
View within SubmissionGathering Resources...NETLLCA Unit Process: This unit process quantifies the total mass of steel required for the construction of a single 150,000 lbs/hr capacity watertube or firetube boiler. The boiler...-
Dataset Size: 253.628 KB
Resource List
View within SubmissionGathering Resources...NETLLCA Unit Process: The amount of aluminum used in the construction of one 26,470 gallon net capacity tanker railcar to be used to haul liquid fuel. The railcar was assumed to be...-
Dataset Size: 321.82 KB
Resource List
View within SubmissionGathering Resources...NETLLCA Unit Process: Based on a single pushoff trailer manufactured by Fliegl, with a 60-cubic-meter capacity and pulled by a separate tractor. This unit process quantifies the...-
Dataset Size: 215.375 KB
Resource List
View within SubmissionGathering Resources... -