Filter by location Clear
"OpenStreetMap contributors"
Type
Groups
Keywords
Formats
-
NETLLCA Unit Process: The operations of the NETL baseline Natural Gas Combined Cycle (NGCC) power plants with or without carbon capture and sequestration (CCS) on the basis of 1 MWh...
-
Dataset Size: 430.214 KB
Resource List
View within SubmissionGathering Resources...NETLLCA Unit Process: Transport of liquid diesel fuel via a pipeline powered by electric pumps. No loss of fuel is assumed during pipeline transport. OSTI ID: 1509184-
Dataset Size: 230.297 KB
Resource List
View within SubmissionGathering Resources...NETLLCA Unit Process: Calculates the number of locomotives and railcars needed to haul coal from the coal mine to the power plant over the lifetime of the plant. Assumes one...-
Dataset Size: 271.308 KB
Resource List
View within SubmissionGathering Resources...NETLLCA Unit Process: This unit process calculates the construction materials that would be required for the installation of hydrokinetic turbines within a river. Hydrokinetic...-
Dataset Size: 587.079 KB
Resource List
View within SubmissionGathering Resources...NETLLCA Unit Process: The operations of the U.S. fleet average coal power generation facilities. OSTI ID: 1509350-
Dataset Size: 440.229 KB
Resource List
View within SubmissionGathering Resources...NETLLCA Unit Process: This process encompasses the amount of materials required to construct a generation II PWR nuclear plant as well as the energy use required for installation...-
Dataset Size: 613.753 KB
Resource List
View within SubmissionGathering Resources...NETLLCA Unit Process: This assembly process apportions the construction and installation requirements of equipment and materials used in the assembly of a geothermal power plant....-
Dataset Size: 673.088 KB
Resource List
View within SubmissionGathering Resources...NETLLCA Unit Process: This unit process includes the materials and energy sources needed for the construction of a Generation III+ Nuclear Power Plant. OSTI ID: 1509384-
Dataset Size: 601.34 KB
Resource List
View within SubmissionGathering Resources...NETLLCA Unit Process: Encompasses the energy, material, and water use and the emissions and discharges during the operation of a Generation III+ nuclear reactor. OSTI ID: 1509422-
Dataset Size: 738.099 KB
Resource List
View within SubmissionGathering Resources...NETLLCA Unit Process: The operation of the U.S. fleet average natural gas power generation facilities. OSTI ID: 1509411-
Dataset Size: 417.34 KB
Resource List
View within SubmissionGathering Resources...NETLLCA Unit Process: Construction of a collector field for a 250 MW solar thermal power plant. OSTI ID: 1509360-
Dataset Size: 642.696 KB
Resource List
View within SubmissionGathering Resources...NETLLCA Unit Process: Operation of a 250 MW solar thermal power plant. OSTI ID: 1509429-
Dataset Size: 664.145 KB
Resource List
View within SubmissionGathering Resources...NETLLCA Unit Process: This unit process tracks materials and energy needed to manufacture high-speed and medium-speed permanent-magnet generators for horizontal 1.5 to 6 MW wind...-
Dataset Size: 639.057 KB
Resource List
View within SubmissionGathering Resources...NETLLCA Unit Process: This unit process includes transport of crude petroleum via a pipeline, which is powered by electric pumps. It is assumed that no loss of crude petroleum...-
Dataset Size: 236.011 KB
Resource List
View within SubmissionGathering Resources...NETLLCA Unit Process: This unit process provides a summary of relevant input and output flows associated with use of blended jet fuel (50% conventional petroleum, 50%...-
Dataset Size: 533.675 KB
Resource List
View within SubmissionGathering Resources...NETLLCA Unit Process: This unit process considers the mass/energy inputs, mass outputs, and air emissions for the torrefaction of biomass, which is the partial gasification of...-
Dataset Size: 618.995 KB
Resource List
View within SubmissionGathering Resources...NETLLCA Unit Process: This unit process includes operation (input and emission flows) of a pulverized coal boiler, which has been repurposed in order to generate electricity from a...-
Dataset Size: 855.034 KB
Resource List
View within SubmissionGathering Resources...NETLLCA Unit Process: The operations of the Integrated Gasification Combined Cycle (IGCC) with or without carbon capture and sequestration (CCS) on the basis of 1 MWh electricity...-
Dataset Size: 399.153 KB
Resource List
View within SubmissionGathering Resources...NETLLCA Unit Process: This unit process quantifies the amount of electricity required and methane emissions associated with the operation of a 500 horsepower, 95% efficiency...-
Dataset Size: 1.893 MB
Resource List
View within SubmissionGathering Resources...NETLLCA Unit Process: Operation of a waterborne tanker for transport of LNG. Fueled primarily from boil-off with supplemental power from diesel fuel. Fuel requirements and select...-
Dataset Size: 268.431 KB
Resource List
View within SubmissionGathering Resources... -