Filter by location Clear
"OpenStreetMap contributors"
Type
Groups
Keywords
Formats
-
NETLLCA Unit Process: This process encompasses the materials necessary for the construction of one steel cord conveyor belt with rubber facing (1.21-m wide), pulleys, and idlers...
-
Dataset Size: 314.73 KB
Resource List
View within SubmissionGathering Resources...NETLLCA Unit Process: Calculates the number of each piece of equipment included in a longwall mining system needed to mine coal at an underground, Illinois No.6 bituminous coal...-
Dataset Size: 236.279 KB
Resource List
View within SubmissionGathering Resources...NETLLCA Unit Process: Operation of an amine-based CO2 recovery system for production natural gas. OSTI ID: 1509407-
Dataset Size: 417.367 KB
Resource List
View within SubmissionGathering Resources...NETLLCA Unit Process: Operation of an amine-based CO2 recovery system for post-membrane acid gas removal. OSTI ID: 1509442-
Dataset Size: 534.492 KB
Resource List
View within SubmissionGathering Resources...NETLLCA Unit Process: Steel-Cord Conveyor System, 72", Construction. OSTI ID: 1509135-
Dataset Size: 335.841 KB
Resource List
View within SubmissionGathering Resources...NETLMITAS 2009 CHN and Carbon Isotope Data METHODS CHN Elemental Analysis: Sample preparation and analytical methods for the Total Organic Carbon (TOC), Total Nitrogen (TN), and...-
Dataset Size: 79 KB
Resource List
View within SubmissionGathering Resources...NETLLCA Unit Process: Based on manufacturer specifications for a John Deere Model 1990 central commodity system (CCS) air drill and a John Deere Model 1870 air hoe drill, which make...-
Dataset Size: 242.361 KB
Resource List
View within SubmissionGathering Resources... -