Filter by location Clear
"OpenStreetMap contributors"
Type
Groups
Keywords
Formats
-
PDF scans of the 23rd Symposium on the Engineering Aspects of Magnetohydrodynamics (1985).
-
Dataset Size: 335.457 MB
Resource List
View within SubmissionGathering Resources...NETLAn increasing percentage of production, particularly natural gas production, will come from deeper and hotter wells than have been exploited to date. Estimates are that the...-
Dataset Size: 124.751 KB
Resource List
View within SubmissionGathering Resources...NETLThis report in satisfaction of the requirements for DOE Contract De-AC21-81MC16220, lists coal gasifiers and gas cleanup systems suitable for supplying fuel to molten carbonate...-
Dataset Size: 20.335 MB
Resource List
View within SubmissionGathering Resources...NETLDownhole drilling motors were first tested in the oil industry in 1873. These early motors had low power out put and did not deliver sufficient torque to operate rock bits...-
Dataset Size: 7.306 MB
Resource List
View within SubmissionGathering Resources...PDF scans of the 19th Symposium on the Engineering Aspects of Magnetohydrodynamics (1981).-
Dataset Size: 50.025 MB
Resource List
View within SubmissionGathering Resources...PDF scans of the 26th Symposium on the Engineering Aspects of Magnetohydrodynamics (1988).-
Dataset Size: 254.913 MB
Resource List
View within SubmissionGathering Resources...PDF scans of the 24th Symposium on the Engineering Aspects of Magnetohydrodynamics (1986).-
Dataset Size: 161.446 MB
Resource List
View within SubmissionGathering Resources...NETLFinal Project Report-DE-FC26-05NT42655-Dexter Magnetic Technologies’ High-Pressure High-Temperature (HPHT) Downhole Turbine Generator is capable of operating at 250 °C and 20,...-
Dataset Size: 2.444 MB
Resource List
View within SubmissionGathering Resources...NETLTo develop a downhole high-temperature turbine generator (HTTG) capable of operating at high pressures (>20,000 psi) and high temperatures (250?C), for powering rotary...-
Dataset Size: 18.016 KB
Resource List
View within SubmissionGathering Resources...NETLCE is participating in a $270 million coal gasification combined cycle repowering project that will provide a nominal 65 MW of electricity to City, Water, light and Power...-
Dataset Size: 1.946 MB
Resource List
View within SubmissionGathering Resources...NETLVolume 2 The generic IGCC power plant produces 746 MW gross (556-megawatt net) electric power and consists of dual-train gasifiers producing clean singes for combustion in two...-
Dataset Size: 3.502 MB
Resource List
View within SubmissionGathering Resources...NETLABB CE is participating in a coal gasification combined cycle repowering project that will provide a nominal 60 MW of electricity to City, Water, Light, and Power (CVVL&P)...-
Dataset Size: 2.104 MB
Resource List
View within SubmissionGathering Resources...NETLDuring last year, development and testing of high-temperature, coal-gas desulfurization sorbents for molten carbonate fuel cell application have been continued, with particular...-
Dataset Size: 17.122 KB
Resource List
View within SubmissionGathering Resources...NETLSeven test fuels were provided to research projects in the Department of Energy Alternative Fuels Utilization Program. Current refining technology was applied for conversion of...-
Dataset Size: 2.059 MB
Resource List
View within SubmissionGathering Resources...NETLDuring one process of mining coal, methane is removed from the coal seam before the coal is mined. This methane is collected underground, piped to the surface, and exhausted to...-
Dataset Size: 6.658 MB
Resource List
View within SubmissionGathering Resources...NETLTo date the commercial application of tar sand deposits in the United States has been limited to their use as paving materials for county roads, parking lots, and driveways...-
Dataset Size: 2.563 MB
Resource List
View within SubmissionGathering Resources...NETLThe IGCC system will consist of CE's air-blown, entrained-flow, two-stage, pressurized coal gasifier; an advanced hot gas cleanup process; a combustion turbine adapted to use...-
Dataset Size: 6.553 MB
Resource List
View within SubmissionGathering Resources...NETLMud pulse telemetry is a method of transmitting information from the vicinity of the drill bit to the surface drilling platform while drilling. Information can be conveyed...-
Dataset Size: 1.751 MB
Resource List
View within SubmissionGathering Resources...NETLAfter a brief background review of fluidized bed combustion, the objectives and status of six pressurized fluidized bed (PFB) projects are described. There are several key...-
Dataset Size: 4.815 MB
Resource List
View within SubmissionGathering Resources...NETLTrends in properties of motor gasolines for the years 1942 through 1984; diesel fuels for the years 1950 through 1983; aviation fuels for the years 1947 through 1983; and...-
Dataset Size: 3.898 MB
Resource List
View within SubmissionGathering Resources... -