CE IGCC Repowering Project Clean Coal II Project

License(s):

Other (Open)

The IGCC system will consist of CE's air-blown, entrained-flow, two-stage, pressurized coal gasifier; an advanced hot gas cleanup process; a combustion turbine adapted to use Low-Btu coal gas; and all necessary coal handling equipment. CWL&P's Lakeside Station (Figure 1) will be the site for this project. The result of repowering will be an IGCC power plant with low environmental emissions and high net plant efficiently. The repowering will increase plant output by 40 MWe through addition of the combustion turbine, thus providing a total IGCC capacity of a nominal 60 MWe. Nearly half of the project will be funded by the United States Department of Energy (DOE), under Round II of the Clean Coal Technology Program, while CWL&P, State of Illinois, and CE will fund the rest.

Followers: 0

Citation (Click to Copy)

Data and Resources

    Gathering Resources...

Keywords

Additional Info

Field Value
Last Updated September 29, 2016, 14:54 (LMT)
Created September 29, 2016, 14:54 (LMT)
Citation Roy Long, CE IGCC Repowering Project Clean Coal II Project, 2016-09-29, https://edx.netl.doe.gov/dataset/ce-igcc-repowering-project-clean-coal-ii-project
Netl Product yes
Poc Email Roy.long@netl.doe.gov
Point Of Contact Roy Long
Program Or Project KMD
Publication Date 1993-12-1