Your browser is not recommended for EDX, we suggest using the latest version of Google Chrome.

Advanced High-Pressure Coiled-Tubing Drilling System Status Report

License(s):

Other (Open)

The goal is to reduce drilling costs by developing technologies that significantly increase rate of penetration (ROP), which reduces overall drilling time. The objective is to develop a drilling system that utilizes high-pressure water jets to improve the ability of PDC diamond bit cutters to remove rock, enabling the system to drill three to five times faster than conventional bit systems, whereby reducing drilling costs by 25 to 50 percent.

Followers: 0

Citation (Click to Copy)

Data and Resources

    Gathering Resources...

Keywords

Additional Info

Field Value
Last Updated September 29, 2016, 15:05 (LMT)
Created September 29, 2016, 15:05 (LMT)
Citation William Maurer ---- Roy Long, Advanced High-Pressure Coiled-Tubing Drilling System Status Report, 2016-09-29, https://edx.netl.doe.gov/dataset/advanced-high-pressure-coiled-tubing-drilling-system-status-report
Netl Product yes
Poc Email Roy.long@netl.doe.gov
Point Of Contact Roy Long
Program Or Project KMD
Publication Date 2003-12-31