Advanced Secondary Recovery Project For The Sooner "D" Sand Unit, Weld County, Colorado

License(s):

Other (Open)

The objective of this project was to increase production at the Sooner D Sand Unit through geologically targeted infill drilling and improved reservoir management of waterflood operations. The Sooner D Sand Unit demonstration project should be an example for other operators to follow for reservoir management of waterflood operations. The Sooner D Sand Unit demonstration project should be an example for other operators to follow for other operators to follow for reservoir characterization and exploitation methodologies to increase production by waterflood from the Creceous D Sandstone in the Denver-Julesburg (D-J) Basin. This project involved multi-disciplinary reservoir characterization using high-density 3D seismic, detailed stratigraphy and reservoir simulation studies. Infill drilling, water-injection conversion and re-completing some wells to add short-radius laterals were based on the results of the reservoir characterization studies. Production response were evaluated using reservoir simulation and production tests. Technology transfer utilized workshops, presentations and technical papers which emphasized the economic advantages of implementing the demonstrated technologies.

Followers: 0

Citation (Click to Copy)

Data and Resources

    Gathering Resources...

Keywords

Additional Info

Field Value
Last Updated September 29, 2016, 14:25 (LMT)
Created September 29, 2016, 14:25 (LMT)
Citation Mark A. Sippel ---- Roy Long, Advanced Secondary Recovery Project For The Sooner "D" Sand Unit, Weld County, Colorado, 2016-09-29, https://edx.netl.doe.gov/dataset/advanced-secondary-recovery-project-for-the-sooner-d-sand-unit-weld-county-colorado0
Netl Product yes
Poc Email Roy.long@netl.doe.gov
Point Of Contact Roy Long
Program Or Project KMD
Publication Date 1996-11-1