This Topical Report presents the results of Task 4 of the Westinghouse ATS Program. The purpose of Task 4 is to determine the technical development needs for conversion of the gas-fired ATS (GFATS). Two closely related, advanced, coal-based power plant technologies have been selected for consideration as the CFATS -- air-blown, coal gasification with hot gas cleaning incorporated into an Integrated Gasification Combined Cycle (IGCC), and the Second-Generation Pressurized Fluidized Bed Combustion (PFBC) combined cycle. These are described and their estimated performance and emissions in the CFATS are reported. A development program for the CFATS is described that focuses on major commercialization issues. These issues are in the areas of combustion, flow distribution, structural analysis, and materials selection.

Followers: 0

Citation (Click to Copy)

Data and Resources

    Gathering Resources...

Keywords

Additional Info

Field Value
Last Updated September 29, 2016, 16:45 (LMT)
Created September 29, 2016, 16:45 (LMT)
Citation Roy Long, Advanced Turbine Systems Program conceptual design and product development: Task 4.0, 2016-09-29, https://edx.netl.doe.gov/dataset/advanced-turbine-systems-program-conceptual-design-and-product-development-task-4-0
Netl Product yes
Poc Email Roy.long@netl.doe.gov
Point Of Contact Roy Long
Program Or Project KMD
Publication Date 1994-6-1