Your browser is not recommended for EDX, we suggest using the latest version of Google Chrome.

BOA: Asbestos pipe-insulation removal robot system, Phase 2. Topical report, January--June 1995

License(s):

Other (Open)

This report explored the regulatory impact and cost-benefit of a robotic thermal asbestos pipe-insulation removal system over the current manual abatement work practice. The authors are currently in the second phase of a two-phase program to develop a robotic asbestos abatement system, comprised of a ground-based support system (including vacuum, fluid delivery, computing/electronics/power, and other subsystems) and several on-pipe removal units, each sized to handle pipes within a given diameter range. The intent of this study was to (i) aid in developing design and operational criteria for the overall system to maximize cost-efficiency, and (ii) to determine the commercial potential of a robotic pipe-insulation abatement system.

Followers: 0

Citation (Click to Copy)

Data and Resources

    Gathering Resources...

Keywords

Additional Info

Field Value
Last Updated September 29, 2016, 15:33 (LMT)
Created September 29, 2016, 15:33 (LMT)
Citation Schempf, H.; Bares, J.E. ---- Roy Long, BOA: Asbestos pipe-insulation removal robot system, Phase 2. Topical report, January--June 1995, 2016-09-29, https://edx.netl.doe.gov/dataset/boa-asbestos-pipe-insulation-removal-robot-system-phase-2-topical-report-january-june-1995
Netl Product yes
Poc Email Roy.long@netl.doe.gov
Point Of Contact Roy Long
Program Or Project KMD
Publication Date 1995-6-1