BX IN SITU OIL SHALE PROJECT, ANNUAL TECHNICAL PROGRESS REPORT FOR MARCH 1, 1981-FEBRUARY 28, 1982 and QUARTERLY TECHNICAL PROGRESS REPORT FOR DECEMBER 1, 1981-FEBRUARY 28, 1982

License(s):

Other (Open)

The objective of this project is to demonstrate the technical feasibility of using superheated steam as a heat carrying medium to retort in situ the oil shale in the Green River formation "leached zone" and provide a mechanism for the recovery of this shale oil with a minimum impact on the environment. Utilizing primarily the natural porosity in the "leached zone," approximately 450 billion BTU of heat have been injected into a site over a 2 year period to heat to retorting temperature a shale zone approximately 540 feet thick and covering about one acre. The field project is located at Equity's BX in situ site in Rio Blanco County in Northwestern Colorado.

Followers: 0

Citation (Click to Copy)

Data and Resources

    Gathering Resources...

Keywords

Additional Info

Field Value
Last Updated September 29, 2016, 20:52 (LMT)
Created September 29, 2016, 20:52 (LMT)
Citation Paul M. Dougan ---- Roy Long, BX IN SITU OIL SHALE PROJECT, ANNUAL TECHNICAL PROGRESS REPORT FOR MARCH 1, 1981-FEBRUARY 28, 1982 and QUARTERLY TECHNICAL PROGRESS REPORT FOR DECEMBER 1, 1981-FEBRUARY 28, 1982, 2016-09-29, https://edx.netl.doe.gov/dataset/bx-in-situ-oil-shale-project-annual-technical-progress-report-for-march-1-1981-february-28-1982
Netl Product yes
Poc Email Roy.long@netl.doe.gov
Point Of Contact Roy Long
Program Or Project KMD
Publication Date 1982-3-20