"In the Department of Energy test of the Edna Delcambre No. 1 well for recovery of natural gas from geopressured-geothermal brine, part of the test produced gas in excess of the amount that could be dissolved in the brine. Where this excess gas originated was unknown and several theories were proposed to explain the source. This annual report describes IGT’s work to match the observed gas/water production with computer simulation. Two different theoretical models were calculated in detail using available reservoir simulators. One model considered the excess gas to be dispersed as small bubbles in pores. The other model considered the excess gas as a nearby free gas cap above the aquifer. Reservoir engineering analysis of the flow test data was used to determine the basic reservoir characteristics. The computer studies revealed that the dispersed gas model gave characteristically the wrong shape for plots of gas/water ratio, and no reasonable match of the calculated values could be made to the experimental results. The free gas cap model gave characteristically better shapes to the gas/water ratio plots if the initial edge of the free gas was only about 400 feet from the well. Because there were two other wells at approximately this distance (Delcambre No. 4 and No. 4A wells) which had a history of down-hole blowouts and mechanical problems, it appears that the source of the excess free gas is from a separate horizon which connected to the Delcambre No. 1 sand via these nearby wells. This conclusion is corroborated by the changes in gas composition when the excess gas occurs and the geological studies which indicate the nearest free gas can to be several thousand feet away. The occurrence of this excess free gas can thus be explained by known reservoir characteristics, and no new model for gas entrapment or production is needed."

Followers: 0

Citation (Click to Copy)

Data and Resources

    Gathering Resources...

Keywords

Additional Info

Field Value
Last Updated September 29, 2016, 21:42 (LMT)
Created September 29, 2016, 21:42 (LMT)
Citation Rogers, Leo A. ---- Roy Long, COMPUTER SIMULATION OF PRODUCTION FROM GEOPRESSURED-GEOTHERMAL AQUIFERS-PROJECT 61025, 2016-09-29, https://edx.netl.doe.gov/dataset/computer-simulation-of-production-from-geopressured-geothermal-aquifers-project-61025
Netl Product yes
Poc Email Roy.long@netl.doe.gov
Point Of Contact Roy Long
Program Or Project KMD
Publication Date 1980-6-1