This report updates an earlier report, ''Design of the Facility as of March 1981'', which was prepared during the commissioning phase of the Experimental Pressurized Fluidized Bed Combustion Facility at Grimethorpe, South Yorkshire. Since that time numerous modifications resulting from operating experience and experimental requirements have been made. The report provides a description of the design of the process equipment and systems which together comprised the Experimental Facility, as it was in March 1984. 21 refs., 48 figs., 10 tabs.

Followers: 0

Citation (Click to Copy)

Data and Resources

    Gathering Resources...

Keywords

Additional Info

Field Value
Last Updated September 29, 2016, 15:58 (LMT)
Created September 29, 2016, 15:58 (LMT)
Citation Roy Long, Design of the facility as of March 1984, 2016-09-29, https://edx.netl.doe.gov/dataset/design-of-the-facility-as-of-march-1984
Netl Product yes
Poc Email Roy.long@netl.doe.gov
Point Of Contact Roy Long
Program Or Project KMD
Publication Date 1985-6-1