Your browser is not recommended for EDX, we suggest using the latest version of Google Chrome.

DETERMINATION OF THE OPTIMUM MASSIVE HYDRAULIC FRACTURING DESIGN FOR THE STIMULATION OF THE WASATCH AND MESAVERDE FORMATION

License(s):

Other (Open)

During November 1977, the following work was accomplished: 1. Natural Buttes Unit No. 18 produced a total of 18,092 HCF in 30 days for an average flow rate of 603 HCFD. II. Natural Buttes Unit No. 19 produced at an average rate of 17 HCFD for 17 III. Natural Buttes Unit No. 14 produced at an average rate 0 E 562 HCFD for 30 days. IV. Natural Buttes Unit No. 20 produced at an average rate of 653 Hem for 18 days. V. Natural But.tes Unit No. 21 is shut in, waiting on cased hole logging. VI. A.. Natural Buttes Unit No. 22 was traced on November 21, 1977. b. Natural Buttes Unit No.9 was cleaned out to 8959 PBTD and tubing and packer were run and set at Sl.92'. NHF was designed and is waiting to be traced. Bids were received and are being evaluated.

Followers: 0

Citation (Click to Copy)

Data and Resources

    Gathering Resources...

Keywords

Additional Info

Field Value
Last Updated September 29, 2016, 14:38 (LMT)
Created September 29, 2016, 14:38 (LMT)
Citation Robert G, Merill ---- Roy Long, DETERMINATION OF THE OPTIMUM MASSIVE HYDRAULIC FRACTURING DESIGN FOR THE STIMULATION OF THE WASATCH AND MESAVERDE FORMATION, 2016-09-29, https://edx.netl.doe.gov/dataset/determination-of-the-optimum-massive-hydraulic-fracturing-design-for-the-stimulation-of-the-wasatch
Netl Product yes
Poc Email Roy.long@netl.doe.gov
Point Of Contact Roy Long
Program Or Project KMD
Publication Date 1977-12-1