Electrodril System Field Test Program. Phase II; Task B: deep drilling system demonstration. Final report

License(s):

Other (Open)

This report documents the results of Task B on the design, procurement, fabrication assembly and test of the Electrodril Deep Drilling System. The report documents key design tradeoffs and delineates the technical approach established for development and verification test. Details of both component and subsystem testing are presented together with the results of the Systems Verification Test program. Of particular interest are the results of a 100 hour bit shaft test and the extensive test of a static inverter-motor combination. The report presents the conclusion that the Systems Verification Test of the Electrodril Deep Drilling System was successful and the recommendation that the Task C Operational Drilling Demonstration be initiated.

Followers: 0

Citation (Click to Copy)

Data and Resources

    Gathering Resources...

Keywords

Additional Info

Field Value
Last Updated September 29, 2016, 16:09 (LMT)
Created September 29, 2016, 16:09 (LMT)
Citation Roy Long, Electrodril System Field Test Program. Phase II; Task B: deep drilling system demonstration. Final report, 2016-09-29, https://edx.netl.doe.gov/dataset/electrodril-system-field-test-program-phase-ii-task-b-deep-drilling-system-demonstration-final
Netl Product yes
Poc Email Roy.long@netl.doe.gov
Point Of Contact Roy Long
Program Or Project KMD