The effort included the design, fabrication and Systems Verification Testing of the Deep Drilling System. The Systems Verification Test was conducted during October 1978 in a test well located on the premises of Brown Oil Tools Inc., Houston, Texas. In general, the Systems Verification test program was an unqualified success. All of the system elements of the Deep Drilling System were exercised and evaluated and in every instance the system can be declared ready for operational well demonstration. The motor/bit shaft combination operated very well and seal performance exceeds the design goals. The rig floor system performed better than expected. The power cable flexural characteristics are much better than anticipated and longitudinal stability is excellent. The prototype production connectors have functioned without failure. The cable reels and drive skid have also worked very well during the test program. The redesigned and expanded instrumentation subsystem also functioned very well. Some electronic component malfunctions were experienced during the early test stages, but they were isolated quickly and repaired. Subsequent downhole instrumentation deployments were successfully executed and downhole data was displayed both in the Electrodril instrumentation trailer and on the remote control and display unit.