Engineer, design, construct, test, and evaluate a pressurized fluidized-bed pilot plant using high-sulfur coal for production of electric power. Phase III: pilot-plant construction. Quarterly report, June 1-August 31, 1980

License(s):

Other (Open)

Technical progress during the period June 1 through August 31, 1980 included the following activities: The PSD permit approval was obtained from the US Environmental Protection Agency. The building permit was obtained from the Borough of Wood-Ridge. Installation designs incorporating modifications to the Total Energy System, Gas Turbine, Free Power Turbine and Waste Heat Boiler are in an advanced stage. Procurement has been initiated on all long lead material. The upper and lower PFB Vessel fabrication was started. Quotations for the Substructure Construction (Bid Package No. 1) are under review in preparation for issuing a purchase order in October 1980. Request for quotation on Structural Steelwork have been issued to potential bidders. Groundbreaking ceremonies took place on June 30, 1980 with the Assistant Secretary of the Department of Energy presiding and the Governor of New Jersey, a Congressional delegation and State Commissioner of Energy and Environment, Borough Officials among other dignitaries in attendance.

Followers: 0

Citation (Click to Copy)

Data and Resources

    Gathering Resources...

Keywords

Additional Info

Field Value
Last Updated September 29, 2016, 16:25 (LMT)
Created September 29, 2016, 16:25 (LMT)
Citation Roy Long, Engineer, design, construct, test, and evaluate a pressurized fluidized-bed pilot plant using high-sulfur coal for production of electric power. Phase III: pilot-plant construction. Quarterly report, June 1-August 31, 1980, 2016-09-29, https://edx.netl.doe.gov/dataset/engineer-design-construct-test-and-evaluate-a-pressurized-fluidized-bed-pilot-plant-using-high
Netl Product yes
Poc Email Roy.long@netl.doe.gov
Point Of Contact Roy Long
Program Or Project KMD
Publication Date 1980-1-1