Front-End Engineering and Design: Project Tundra Carbon Capture System

Minnkota Power Cooperative is performing a front-end engineering and design (FEED) study to install a post-combustion carbon dioxide (CO2) capture system at Square Butte Electric Cooperative’s Milton R. Young Station, Unit 2 (MRY2), located near Center, North Dakota. Based on the results of pre-FEED studies of two leading commercial-ready carbon capture technologies, Fluor’s Econamine FG Plus™ (EFG+) technology has been selected for installation.

Followers: 0

Authors

Citation (Click to Copy)

Data and Resources

    Gathering Resources...

Keywords

Additional Info

Field Value
Last Updated November 2, 2022, 19:02 (LMT)
Created June 3, 2022, 19:24 (LMT)
Citation Andrew Jones, Front-End Engineering and Design: Project Tundra Carbon Capture System, 6/3/2022, https://edx.netl.doe.gov/dataset/front-end-engineering-and-design-project-tundra-carbon-capture-system
Geospatial no
Netl Product yes
Poc Email andrew.jones@netl.doe.gov
Point Of Contact Andrew Jones
Program Or Project Carbon Capture
Project Number FE0031845