Your browser is not recommended for EDX, we suggest using the latest version of Google Chrome.

Fuel preparation plant performance and modifications, April 1983-March 1984

License(s):

Other (Open)

The Fuel Preparation Plant processes raw coal by crushing, drying, cooling and screening and mixes this in a predetermined ratio with a sulphur absorbing agent (dolomite or limestone). This mixture is used as feed for the Pressurized Fluidized Bed Combustor at Grimethorpe. The plant contains two systems for the pneumatic conveying of solids: one for transport of the prepared raw coal to an intermediate storage silo and one for the transport of blended coal/sorbent mixture from the Fuel Preparation Plant to the Main Facility building. This report covers the period from April 1983 to March 1984, which completes this phase of the facility's operation. New systems for pneumatic conveying and a new primary screen for raw coal were commissioned and operated. Details of the operation and subsequent minor modifications are included. Existing operation/equipment problems which were still experienced after April 1983 were mainly solved and the system was brought up to a standard where coal processing became satisfactory. 2 refs., 21 figs., 3 tabs.

Followers: 0

Citation (Click to Copy)

Data and Resources

    Gathering Resources...

Keywords

Additional Info

Field Value
Last Updated September 29, 2016, 15:59 (LMT)
Created September 29, 2016, 15:59 (LMT)
Citation Roy Long, Fuel preparation plant performance and modifications, April 1983-March 1984, 2016-09-29, https://edx.netl.doe.gov/dataset/fuel-preparation-plant-performance-and-modifications-april-1983-march-1984
Netl Product yes
Poc Email Roy.long@netl.doe.gov
Point Of Contact Roy Long
Program Or Project KMD
Publication Date 1985-6-1