Your browser is not recommended for EDX, we suggest using the latest version of Google Chrome.

High volume-high value usage of flue gas desulfurization (FGD) by-products in underground mines: Phase 2 -- Field investigations. Quarterly report, October 1--December 31, 1997

License(s):

Other (Open)

The field investigation phase of the project was essentially completed when grout placed into auger holes at the Lodestar Energy mine site during Summer 1997 was sampled. Mining had proceeded to a point where the strata overlying the coal was completely removed, thus exposing the grout-filled auger holes. All of the auger holes contained either grout from these experiments or shale that in-filled the non-grouted holes during the process of clearing the top surface of the coal. Eleven grouted holes were sampled, utilizing hammers and chisels, for physical (strength) testing, as well as chemical, mineralogical, and microscopical analysis. Upon arrival at the laboratory, moisture contents, densities, and void ratios were obtained before disturbing the samples, and after strength testing. Representative samples of each grout were then cut into flat-sided prisms, with a height: width ratio {approx}2, to be used for testing of unconfined compressive strength. In summary, all of the grouts had very good mechanical strength, ranging from 1000 psi to 2250 psi. The lowest compressive strength was recorded on a bed ash-based grout.

Followers: 0

Citation (Click to Copy)

Data and Resources

    Gathering Resources...

Keywords

Additional Info

Field Value
Last Updated September 29, 2016, 15:38 (LMT)
Created September 29, 2016, 15:38 (LMT)
Citation Roy Long, High volume-high value usage of flue gas desulfurization (FGD) by-products in underground mines: Phase 2 -- Field investigations. Quarterly report, October 1--December 31, 1997, 2016-09-29, https://edx.netl.doe.gov/dataset/high-volume-high-value-usage-of-flue-gas-desulfurization-fgd-by-products-in-underground-mines-ph01
Netl Product yes
Poc Email Roy.long@netl.doe.gov
Point Of Contact Roy Long
Program Or Project KMD
Publication Date 1998-8-1