Your browser is not recommended for EDX, we suggest using the latest version of Google Chrome.

Integrated gasification combined-cycle power plant at Sears Island, Maine: feasibility study. Final report. Volume II. [Sears Island, Maine]

License(s):

Other (Open)

Volume 2 contains a discussion of US coal supplies within a reasonable distance, their cost, and transportation method, depending somewhat on the mine location. Also, included are technical and environmental evaluations and comparison with those of a coal-fired plant equipped with a scrubber. Site selection considerations, baseline ecology, permit applications, emissions and air and water pollution control, air and water quality impacts, socio-economic factors, and engineering cost data. The potential for improvements of the combined-cycle plant is considered: increase in temperature on efficiency, advanced gas turbine cycle, acid gas removal (Rectisol II).

Followers: 0

Citation (Click to Copy)

Data and Resources

    Gathering Resources...

Keywords

Additional Info

Field Value
Last Updated September 29, 2016, 16:11 (LMT)
Created September 29, 2016, 16:11 (LMT)
Citation Roy Long, Integrated gasification combined-cycle power plant at Sears Island, Maine: feasibility study. Final report. Volume II. [Sears Island, Maine], 2016-09-29, https://edx.netl.doe.gov/dataset/integrated-gasification-combined-cycle-power-plant-at-sears-island-maine-feasibility-study-fina
Netl Product yes
Poc Email Roy.long@netl.doe.gov
Point Of Contact Roy Long
Program Or Project KMD
Publication Date 1983-3-30