MPC 10-4 Final Falloff Test

License(s):

License Not Specified

This report contains the interpretation of the final falloff test following overperforating of the completion on the Plant Ratcliffe 10 4 No. 1 well completed in the Paluxy Formation. The memory gauge was placed on the workstiring at a depth of 4,808 feet. Flowing pressures were monitored during the 4 hour injection period and the well was shut in at surface for a 14.2 hour falloff test. The final rate prior to shut in is 7,920 bpd (231 gpm). Section 2 provides a detailed listing of the rate history used in the analysis.

Followers: 0

Citation (Click to Copy)

Data and Resources

    Gathering Resources...

Keywords

Additional Info

Field Value
Last Updated November 6, 2020, 17:35 (LMT)
Created April 2, 2020, 01:30 (LMT)
Citation Author: GeoStock Sandia Title: "Well Test Interpretation for MPC 10-4 No.1 - 2019 Last Falloff Kemper County, Mississippi" Date: 6/12/19
Netl Product yes
Poc Email Mary.Sullivan@NETL.DOE.GOV
Point Of Contact Mary Sullivan
Program Or Project CarbonSAFE