Naturally fractured tight gas reservoir detection optimization. Quarterly report, January--March 1996

License(s):

Other (Open)

This progress report covers field performance test plan and three- dimensional basins simulator. The southern portion of the Rulison Field was originally selected as the location for the seismic program. Due to permitting problems the survey was unable to go forward. The northern Rulison Field has been modeled to determine suitability for the seismic program. The survey has been located over an area that contains the best producing, most intensively fractured wells and the worst, least fractured wells. Western Geophysical surveyed in the 564 vibrator points and 996 receiver stations. Maps displaying the survey design and modeled offset ranges can be found in Appendix A. The seismic acquisition crew is scheduled to arrive on location by April 7th. The overall development of the fracture prediction simulator has led to new insights into the nature of fractured reservoirs. In particular, the investigators have placed them within the context of recent idea on basin compartments. These concepts an their overall view of the physico-chemical dynamics of fractured reservoir creation are summarized in the report included as Appendix B entitled Prediction of Fractured Reservoir Location and Characteristics: A Basin Modeling Approach. The full three dimensional, multi-process basin simulator, CIRF.B, is operational and is being tested.

Followers: 0

Citation (Click to Copy)

Data and Resources

    Gathering Resources...

Keywords

Additional Info

Field Value
Last Updated September 29, 2016, 15:34 (LMT)
Created September 29, 2016, 15:34 (LMT)
Citation Roy Long, Naturally fractured tight gas reservoir detection optimization. Quarterly report, January--March 1996, 2016-09-29, https://edx.netl.doe.gov/dataset/naturally-fractured-tight-gas-reservoir-detection-optimization-quarterly-report-january-march-1901
Netl Product yes
Poc Email Roy.long@netl.doe.gov
Point Of Contact Roy Long
Program Or Project KMD
Publication Date 1996-4-1