Your browser is not recommended for EDX, we suggest using the latest version of Google Chrome.

Piperazine Advanced Stripper Front End Engineering Design

The University of Texas at Austin (UT-Austin) is performing a front-end engineering design (FEED) study of the piperazine advanced stripper (PZAS) process for carbon dioxide (CO2) capture from the natural gas combined cycle (NGCC) power plant at Golden Spread Electric Cooperative’s (GSEC) Mustang Station in Denver City, Texas.

Followers: 0

Authors

Citation (Click to Copy)

Data and Resources

    Gathering Resources...

Keywords

Additional Info

Field Value
Last Updated November 2, 2022, 19:03 (LMT)
Created November 2, 2022, 17:26 (LMT)
Citation Andrew Jones, Piperazine Advanced Stripper Front End Engineering Design, 11/2/2022, https://edx.netl.doe.gov/dataset/piperazine-advanced-stripper-front-end-engineering-design
Geospatial no
Netl Product yes
Poc Email andrew.jones@netl.doe.gov
Point Of Contact Andrew Jones
Program Or Project Carbon Capture
Project Number FE0031844