Post waterflood CO2 miscible flood in light oil fluvial - dominated deltaic reservoirs. Technical progress report, October 1, 1994--December 30, 1994. 1st Quarter, fiscal year 1995

License(s):

Other (Open)

Production is averaging about 450 BOPD for the quarter. The fluctuation was primarily due to a temporary shutdown of CO{sub 2} delivery and maturing of the first WAG cycle. CO{sub 2} and water injection were reversed again in order to optimize changing yields and water cuts in the producing wells. Measured BHP was close to the anticipated value. A limited CO{sub 2} volume of 120 MMCF was injected to stimulate well Kuhn No. 6 to test the Huff-Puff process, since the well did not respond to CO{sub 2} injection from the main reservoir. The well will be placed on February 1, 1995. Total CO{sub 2} injection averaged this quarter about 8.8 MMCFD, including 3.6 MMCFD purchased CO{sub 2} from Cardox. The stratigraphy of the sand deposits is also discussed.

Followers: 0

Citation (Click to Copy)

Data and Resources

    Gathering Resources...

Keywords

Additional Info

Field Value
Last Updated September 29, 2016, 15:31 (LMT)
Created September 29, 2016, 15:31 (LMT)
Citation Roy Long, Post waterflood CO2 miscible flood in light oil fluvial - dominated deltaic reservoirs. Technical progress report, October 1, 1994--December 30, 1994. 1st Quarter, fiscal year 1995, 2016-09-29, https://edx.netl.doe.gov/dataset/post-waterflood-co2-miscible-flood-in-light-oil-fluvial-dominated-deltaic-reservoirs-technical-p
Netl Product yes
Poc Email Roy.long@netl.doe.gov
Point Of Contact Roy Long
Program Or Project KMD
Publication Date 1994-1-15