Your browser is not recommended for EDX, we suggest using the latest version of Google Chrome.

Power Systems Development Facility. First quarterly report, 1997

License(s):

Other (Open)

The objective of this project, herein referred to as the Power Systems Development Facility (PSDF), is to evaluate hot gas particle control technologies using coal derived gas streams. This project entails the design, construction, installation, and use of a flexible test facility which can operate under realistic gasification and combustion conditions. The major particulate control device (PCD) issues to be addressed include the integration of the PCDs into coal utilization systems, on-line cleaning techniques, chemical and thermal degradation of components, fatigue or structural failures, blinding, collection efficiency as a function of particle size, and scale-up of particulate control systems to commercial size.

Followers: 0

Citation (Click to Copy)

Data and Resources

    Gathering Resources...

Keywords

Additional Info

Field Value
Last Updated September 29, 2016, 15:37 (LMT)
Created September 29, 2016, 15:37 (LMT)
Citation Roy Long, Power Systems Development Facility. First quarterly report, 1997, 2016-09-29, https://edx.netl.doe.gov/dataset/power-systems-development-facility-first-quarterly-report-1997
Netl Product yes
Poc Email Roy.long@netl.doe.gov
Point Of Contact Roy Long
Program Or Project KMD
Publication Date 1997-7-1