TURBODRILL TESTING PROJECT PHASE I

License(s):

Other (Open)

This report describes Phase I and shakedown testing and the results obtained in the bench testing of the 5-3/8 inch Maurer turbo drill. This work was performed under Contract No. DE-AC21-78MC08089 for the Methane Recovery from Coalbeds Project of the Morgantown Energy Technology Center(METC) of the Department of Energy (DOE). The turbo drill was built by Maurer Engineering, Inc. (MEI) under Contracts EY -77-C-21-8093 and EM-78-C-21-8380 with DOE/METC. Phase I testing was conducted at TRW Mission Manufacturing Company in Houston, Texas, according to the Test Plan appended to this report.

Followers: 0

Citation (Click to Copy)

Data and Resources

    Gathering Resources...

Keywords

Additional Info

Field Value
Last Updated September 29, 2016, 14:45 (LMT)
Created September 29, 2016, 14:45 (LMT)
Citation Donald R. Watkins ---- Roy Long, TURBODRILL TESTING PROJECT PHASE I, 2016-09-29, https://edx.netl.doe.gov/dataset/turbodrill-testing-project-phase-i
Netl Product yes
Poc Email Roy.long@netl.doe.gov
Point Of Contact Roy Long
Program Or Project KMD
Publication Date 1980-7-1