Your browser is not recommended for EDX, we suggest using the latest version of Google Chrome.

Use of treated gasification wastewater in a pilot cooling tower. Phase I. Final report for the period ending January 31, 1984

License(s):

Other (Open)

During the UNDERC cooling tower tests, data were colleced and evaluated in five major areas: characterization of cooling tower streams, process performance, biofouling, corrosion, and inorganic/organic fouling. A summary of the results and conclusions for each area is presented. Recommendations are provided for research and development programs to further define the pretreatment and operating requirements for the use of wastewater as cooling tower makeup. The results of the Phase I-Pilot Cooling Tower test have revealed several potential problems that may arise from the use of a relatively high organic content gas liquor as cooling tower makeup. Most of the problems identified are related to the presence of organics in the wastewater which promote biofouling/fouling, corrosion, and emissions from the cooling tower. The Phase II-Pilot Cooling Tower Test will address this issue by identifying the advantages of further treatment of stripped gas liquor to reduce the organic content to a lower level before use in the cooling tower. This test will parallel the Phase I test using the same system and monitoring procedures. Comparison of the results of Phase I and Phase II tests will provide an indication of how well problem areas can be avoided with additional makeup water pretreatment. 39 references, 34 tables, and 25 figures.

Followers: 0

Citation (Click to Copy)

Data and Resources

    Gathering Resources...

Keywords

Additional Info

Field Value
Last Updated September 29, 2016, 16:41 (LMT)
Created September 29, 2016, 16:41 (LMT)
Citation Willson, W.G.; Hendrikson, J.G.; Mann, M.D.; Galegher, S.J.; Gallagher, J.R.; Mayer, G.G.; Thomas, W.C.; Winton, S.L.; Nelson, D.F. ---- Roy Long, Use of treated gasification wastewater in a pilot cooling tower. Phase I. Final report for the period ending January 31, 1984, 2016-09-29, https://edx.netl.doe.gov/dataset/use-of-treated-gasification-wastewater-in-a-pilot-cooling-tower-phase-i-final-report-for-the-peri
Netl Product yes
Poc Email Roy.long@netl.doe.gov
Point Of Contact Roy Long
Program Or Project KMD
Publication Date 1984-5-16