NETLThe LTC 1073 Vacuum Blasting Machine uses a high capacity, direct pressure blasting system incorporating a continuous feed for the blast media. The blast media cleans the...
-
Dataset Size: 0 bytes
Resource List
View within SubmissionGathering Resources... -
-
NETLMinor changes were made in the steam/water pressure pipe routing from and to boiler shell, to accommodate the bed module orientation change. The ash silo pad elevation was...
-
Dataset Size: 0 bytes
Resource List
View within SubmissionGathering Resources... -
-
NETLThe major objective of the Phase I test program is to confirm the feasibility of the MTCI bimodal particle size approach to enhance particulate control by acoustic ash...
-
Dataset Size: 0 bytes
Resource List
View within SubmissionGathering Resources... -
-
NETLReduce Drilling Costs and Environmental Impact Increase Reservoir Imaging Resolution and Real-time Data Acquisition These new technologies will support business models for: -...
-
Dataset Size: 306.751 KB
Resource List
View within SubmissionGathering Resources... -
-
NETL"In Accordance with the requirements of our Contract #EF-77-C-03-1723, our quarterly report for the period August 1, 1977 to October 31, 1977 follows: As of this reporting...
-
Dataset Size: 2.045 MB
Resource List
View within SubmissionGathering Resources... -
-
NETLProgress of government-sponsored projects directed toward increasing gas production from the low-permeability gas sands of the western United States is summarized. A Technology...
-
Dataset Size: 5.592 MB
Resource List
View within SubmissionGathering Resources... -
-
NETLThe DOE-funded CO/sub 2/ Mobility Control Test consists of four phases: I - Initial Water Injection; II - Surfactant Pad Injection; III - CO/sub 2/ Foam Injection; and IV -...
-
Dataset Size: 0 bytes
Resource List
View within SubmissionGathering Resources... -
-
NETLResearch on potential uses of solid wastes from fluidized-bed combustion processes included the following activities during this quarterly report period: chemical analysis was...
-
Dataset Size: 0 bytes
Resource List
View within SubmissionGathering Resources... -
-
NETLThe ELECTROSORB{reg_sign} {open_quotes}C{close_quotes} process is an electrokinetic process for decontaminating concrete. ELECTROSORB{reg_sign} {open_quotes}C{close_quotes} uses...
-
Dataset Size: 0 bytes
Resource List
View within SubmissionGathering Resources... -
-
NETLThe topical report, which summarized the literature survey on waste and its management, was issued and approved by the Department of Energy; this completed Task 1. In...
-
Dataset Size: 0 bytes
Resource List
View within SubmissionGathering Resources... -
-
NETLTwo bed ash transfer systems have been used at the Fluidized Bed Combustion Project at Grimethorpe, South Yorkshire, UK. The original system incorporated an ash outlet isolated...
-
Dataset Size: 0 bytes
Resource List
View within SubmissionGathering Resources... -
-
NETLThe coproducts wig be collected and handled to limit their exposure to air. The aim is to ensure the coproducts are as close as possible to those which would be generated by an...
-
Dataset Size: 0 bytes
Resource List
View within SubmissionGathering Resources... -
-
NETL"In March and April of 1982, personnel from Nickens and Associates of Montrose, Colorado conducted a cultural resource inventory at four proposed core hole locations in the Glen...
-