Filter by location Clear
"OpenStreetMap contributors"
Type
Groups
Keywords
Formats
-
NETLThe material contained in this final report is a summary of the support provided by Pyros under DOE Contract Number DE-AC01-82FE50037 in support of Fossil Energy's (FE's) Office...
-
Dataset Size: 44.892 MB
Resource List
View within SubmissionGathering Resources...NETLThis report addresses progress on Advanced Turbine Systems (ATS) design and testing. The most important program milestone to date occurred during this quarter. Allison...-
Dataset Size: 0 bytes
Resource List
View within SubmissionGathering Resources...NETLCompletion of the Hoe Creek No. 3 experiment in October may have been a chemical processing milestone. It put the wraps on another developmental season for in situ coal...-
Dataset Size: 11.015 MB
Resource List
View within SubmissionGathering Resources...NETL"We have just completed our fourth full year working under a succession of changes brought about in response to our Nation's critical energy problem. The first year (1975)...-
Dataset Size: 6.268 MB
Resource List
View within SubmissionGathering Resources...NETLThis plan describes research work to be conducted during the period April 1, 1985 through March 31, 1986. The plan is based on the statement of work included in the agreement...-
Dataset Size: 19.777 MB
Resource List
View within SubmissionGathering Resources...NETLPassage of the nuclear Waste Policy Act of 1982 was a major milestone in the Nation's management of nuclear waste. Signed into law by the President on January 7, 1983, this Act...-
Dataset Size: 877.01 KB
Resource List
View within SubmissionGathering Resources...NETLThe passage of the Nuclear Waste Policy Act of 1982 was a major milestone in the Nation's management of nuclear waste. This act. Which was signed into law by the president on...-
Dataset Size: 1.075 MB
Resource List
View within SubmissionGathering Resources...NETLMilestone report - FY2018, Subtask 3.3 for the Advanced Reaction Systems Program-
Dataset Size: 502.055 KB
Resource List
View within SubmissionGathering Resources...NETLThis status report summarizes the project BE11B (Thermal Processes for Heavy Oil Recovery) research activities conducted in FY93 and completes milestone 7 of this project. A...-
Dataset Size: 0 bytes
Resource List
View within SubmissionGathering Resources...NETLProgress reports are presented for tasks 1 through 4. Task 1 - Hydraulic/Natural Fracture Interaction. This task was completed in this reporting period. The primary result is a...-
Dataset Size: 0 bytes
Resource List
View within SubmissionGathering Resources...NETLContract Tasks: Accomplishments are presented for Tasks 1 and 3. Task 1 - Hydraulic/Natural Fracture Interaction. Task 1 milestones for this reporting period were: (1B) material...-
Dataset Size: 0 bytes
Resource List
View within SubmissionGathering Resources...NETLThe progress during September of government-sponsored projects, directed towards increasing gas production from low permeability gas sands of the Western United States, is...-
Dataset Size: 6.223 MB
Resource List
View within SubmissionGathering Resources...NETLIn the Geokinetics process, a pattern of blast holes is drilled from the surface, through the overburden, and into the oil shale bed. The holes are loaded with explosives and...-
Dataset Size: 15.64 MB
Resource List
View within SubmissionGathering Resources...NETLThis document describes the basic elements of the planned CO2 injection activities that were conducted as part of the PCOR Phase II Lignite Demonstration Project.-
Dataset Size: 8.419 MB
Resource List
View within SubmissionGathering Resources...NETLThe expanded seismic campaign consists of acquisition, processing, and interpretation of multiple time-lapse seismic data sets including 2-D surface seismic data, 3-D surface...-
Dataset Size: 442.793 KB
Resource List
View within SubmissionGathering Resources...NETLThe Nuclear Waste Policy Act of 1982 requires that the Secretary of Energy prepare, in cooperation with affected federal agencies, a project Decision Schedule that portrays the...-
Dataset Size: 8.035 MB
Resource List
View within SubmissionGathering Resources...NETLPassage of the Nuclear Waste Policy Act of 1982 was a major milestone in the nation's management of nuclear waste. Signed into law by the President on January 7, 1983, this Act...-
Dataset Size: 916.917 KB
Resource List
View within SubmissionGathering Resources...NETLSpecific efforts summarized in this report include the following: • Analysis of rock samples within the CO2 injection zone (Muddy Formation) as well as on the sealing formations...-
Dataset Size: 49.213 MB
Resource List
View within SubmissionGathering Resources... -