Filter by location Clear
"OpenStreetMap contributors"
Type
Groups
Keywords
Formats
-
NETL"In part A of this report, it is contended that the meterology and air quality baseline monitoring portion of the environmental protection program instituted at the prototype,...
-
Dataset Size: 6.142 MB
Resource List
View within SubmissionGathering Resources...NETLIn 2003, the United States Department of Energy (DOE) issued awards initiating seven Regional Carbon Sequestration Partnerships (RCSP) spanning the United States and portions of...-
Dataset Size: 1.638 MB
Resource List
View within SubmissionGathering Resources...NETLSince October 2005, the Zama oil field in northwestern Alberta, Canada, has been the site of acid gas (approximately 80% CO2 and 20 H2S) injection for the simultaneous purpose...-
Dataset Size: 0 bytes
Resource List
View within SubmissionGathering Resources...NETL"in 1969, the U. S. Department of the Interior initiated planning for a prototype oil shale leasing program that eventually resulted in Gulf Oil Corporation and Standard Oil...-
Dataset Size: 127.703 MB
Resource List
View within SubmissionGathering Resources...NETL"This scope of work describes the tasks that are being conducted to fulfills RBOSC's obligations to monitor selected environmental parameters during development of oil shale...-
Dataset Size: 83.664 MB
Resource List
View within SubmissionGathering Resources...NETLThis is the first of a series of quarterly reports to be submitted to the Area Oil Shale Supervisor of the U. S. Geological Survey. The period converted by this report is from...-
Dataset Size: 14.093 MB
Resource List
View within SubmissionGathering Resources...NETLThis APR describes the operational programs on Federal Tract C-a from January 1, 1982 through December 31, 1982. An environmental monitoring report is being submitted separately...-
Dataset Size: 8.705 MB
Resource List
View within SubmissionGathering Resources...NETLThe objective of the BX in situ oil shale project is to demonstrate the technical feasibility of using superheated steam as a heat carrying medium to retort in situ the oil...-
Dataset Size: 10.321 MB
Resource List
View within SubmissionGathering Resources...NETLPrefracture water quality and hydrology analyses have been completed for the TESI site near Rock Springs, Wyoming. Sampling were conducted primarily at six observations wells...-
Dataset Size: 11.409 MB
Resource List
View within SubmissionGathering Resources...NETLThree groundwater samples collected near two underground coal gasification (UCG) sites 15 mo after the end of gasification were analyzed for dissolved organic contaminants. The...-
Dataset Size: 2.33 MB
Resource List
View within SubmissionGathering Resources...NETLOn January 6, 1983, Texas Gas Development Corporation, in response to the Synthetic Fuels Corporation's (SFC) Third Solicitation, submitted a proposal to SFC for a Commercial...-
Dataset Size: 41.38 MB
Resource List
View within SubmissionGathering Resources...NETLThe objective of the BX In Situ Oil Shale Project is to demonstrate the technical feasibility of using superheated steam as a heat-carrying medium to retort in situ the oil...-
Dataset Size: 9.959 MB
Resource List
View within SubmissionGathering Resources...NETLThe purpose of the Nuclear Waste System Integration (NWSI) Program is to identify opportunities to improve the performance and reduce the cost of the civilian radioactive waste...-
Dataset Size: 1.212 MB
Resource List
View within SubmissionGathering Resources...NETLThe Basalt Waste Isolation Project (BWIP) Public Release System (PRS) is intended to provide program participants with all documents and data necessary to monitor and...-
Dataset Size: 33.733 MB
Resource List
View within SubmissionGathering Resources...NETLThis folder contains results of air and water monitoring before, during, and after hydraulic fracturing. Nearby water wells were used to collect water and assess quality...-
Dataset Size: 5.855 MB
Resource List
View within SubmissionGathering Resources...NETLThe achievement of the objectives requires that monitoring of designated environmental parameters be conducted beginning six months prior to the commencement of development...-
Dataset Size: 7.741 MB
Resource List
View within SubmissionGathering Resources...NETLThese data sets include the data presented in Figures 2 through 11 of "Zhou, Q., Yang, X., Zhang, R., Hosseini, S. A., Ajo-Franklin, J. B., Freifeld, B. M., Daley, T. M., &...-
Dataset Size: 14.517 MB
Resource List
View within SubmissionGathering Resources...NETLMonitoring and control of water pollution from underground coal gasification requires methods that are sensitive to the contaminants in question and which are significantly from...-
Dataset Size: 1.393 MB
Resource List
View within SubmissionGathering Resources...NETLThe US Department of Energy Hoe Creek Underground Coal Gasification Experimental site has been the subject of many environmentally directed investigations. To date, these...-
Dataset Size: 2.538 MB
Resource List
View within SubmissionGathering Resources...NETLUNDERGROUND GASIFICATION FOR STEEPLY DIPPING COAL BEDS--(RAWLINS UCG TEST 2 CAVITY DEFINITION STUDY)The cavity definition study of the first test of the DOE UCG-SDB program, provided results to plan, install, instrument and monitor the second test at Rawlins, Wyoming. The...-
Dataset Size: 4.213 MB
Resource List
View within SubmissionGathering Resources... -