Filter by location Clear
"OpenStreetMap contributors"
Type
Groups
Keywords
Formats
-
NETLFor strategic, economic, and environmental reasons, many U.S. drilling frontiers deserve further review. One such frontier is natural gas in deep sedimentary basins. Deep...
-
Dataset Size: 185.729 KB
Resource List
View within SubmissionGathering Resources...NETLContamination in low permeability soils poses a significant technical challenge to in-situ remediation efforts. Poor accessibility to the contaminants and difficulty in delivery...-
Dataset Size: 0 bytes
Resource List
View within SubmissionGathering Resources...NETLContamination in low permeability soils poses a significant technical challenge to in situ remediation efforts. Poor accessibility to the contaminants and difficulty in...-
Dataset Size: 0 bytes
Resource List
View within SubmissionGathering Resources...NETLContamination in low permeability soils poses a significant technical challenge to in-situ remediation efforts. Poor accessibility to the contaminants and difficulty in delivery...-
Dataset Size: 0 bytes
Resource List
View within SubmissionGathering Resources...NETLA new approach to high resolution reservoir characterization is considered, based on the use of neural networks. These networks will be used to construct a transform which will...-
Dataset Size: 6.12 MB
Resource List
View within SubmissionGathering Resources...NETLContamination in low-permeability soils poses a significant technical challenge for in situ remediation efforts. Poor accessibility to the contaminants and difficulty in...-
Dataset Size: 0 bytes
Resource List
View within SubmissionGathering Resources...NETLPhase I of the Pacific project covers design engineering of a single retort, 18,000 bbl per day shale oil plant. Volume II includes the following: (1) general which covers...-
Dataset Size: 0 bytes
Resource List
View within SubmissionGathering Resources...NETLContamination in low permeability soils poses a significant technical challenge to in-situ remediation efforts. Poor accessibility to the contaminants and difficulty in delivery...-
Dataset Size: 0 bytes
Resource List
View within SubmissionGathering Resources...NETLThe deployment of innovative DOE-EM technologies could provide more cost-effective treatments than remediation technologies and methods currently in use. By building...-
Dataset Size: 0 bytes
Resource List
View within SubmissionGathering Resources...NETLThe proposed Lost Hills CO2 Pilot was designed with the following goals and objectives in mind: ? Test the technical and economic viability of CO2 flooding the low permeability...-
Dataset Size: 1.321 MB
Resource List
View within SubmissionGathering Resources...NETLThis progress report covers field performance test plan and three- dimensional basins simulator. The southern portion of the Rulison Field was originally selected as the...-
Dataset Size: 0 bytes
Resource List
View within SubmissionGathering Resources...NETLBased on the information presented in this report, our conclusions regarding the potential for new and novel fracture stimulation technologies to enhance the deliverability of...-
Dataset Size: 0 bytes
Resource List
View within SubmissionGathering Resources...NETLThe nations of East Central Europe regained their political and economic freedom in 1989, ending nearly a half century of centrally planned economies under the hegemony of the...-
Dataset Size: 0 bytes
Resource List
View within SubmissionGathering Resources...NETLThe BEACON process involves the catalytic deposition of a highly reactive carbon from a gas stream containing carbon monoxide. The carbon-depleted gas is combusted with air to...-
Dataset Size: 0 bytes
Resource List
View within SubmissionGathering Resources...NETLImplementation of the work program of Budget Period 2 of the East Binger Unit (?EBU?) DOE Project continues. Major development work planned for the project includes the drilling...-
Dataset Size: 1.411 MB
Resource List
View within SubmissionGathering Resources...NETLIn 2009, the U.S. Department of Energy’s Big Sky Regional Carbon Sequestration Partnership completed drilling the first carbon dioxide (CO2) sequestration pilot borehole well...-
Dataset Size: 5.393 MB
Resource List
View within SubmissionGathering Resources...NETLTampa Electric Company continued efforts to complete construction and start-up of the Polk Power Station, Unit {number_sign}1 which will use Integrated Gasification Combined...-
Dataset Size: 0 bytes
Resource List
View within SubmissionGathering Resources...NETLThe following figures are included: Westinghouse (W.) SOFC pilot manufacturing facility; cell scale-up plan; W. 25 kW SOFC unit at the utility`s facility on Rokko Island;...-
Dataset Size: 0 bytes
Resource List
View within SubmissionGathering Resources...NETLThe upper aquifers in the A&M area of the Savannah River Site are known to be contaminated by chlorinated solvents. Remediation plans depend critically on continuity of a...-
Dataset Size: 0 bytes
Resource List
View within SubmissionGathering Resources...NETLThis Cyber Security Plan was developed to protect the data and application systems used to conduct the business of the National Petroleum Technology Office (NPTO) of the...-
Dataset Size: 5.051 MB
Resource List
View within SubmissionGathering Resources... -